Development of Quality Performance Indicators for Quality Management in Construction Projects

نویسندگان

  • Sang-Hoon Song
  • Hyun-Soo Lee
  • Moonseo Park
چکیده

The growing competitions among companies intensified by the rapid changes in business environments are forcing them to adopt a new managerial paradigm. The traditional production-oriented management focusing on higher productivity has transformed into the customer-oriented management aiming at achieving customer satisfaction. Under these circumstances, quality management is one of the critical concepts for innovating corporations and improving their competitive edge. Despite the companies’ recognition of the significance of quality, most of them do not have a solid basis for quality management and substantial action programs. In the construction industry, there have been many attempts to adopt quality management as a tool for continuous improvement. They include Six-Sigma which has already been proven to be very useful for fostering quality innovation in the manufacturing industry. But these kinds of efforts are not sufficient enough to achieve organizational goals in quality management. It is essential to also take into consideration the root causes of inefficiency in the quality management. The low level of construction quality is mainly caused by the result-oriented quality management owing to the fact that quality problems can be detected only after they occur. Also, few systems provide the quality managers with numerical objectives or tangible goals. This study suggests a data-based quality management as a solution to the foregoing problems and discusses the methods of measuring and analyzing the performance related to quality in a construction company. It establishes the quality indicators to measure quality performance objectively. The management objectives and CSFs are defined according to the three management levels: strategic level; project level; and operational level, and then the indicators to measure and manage them are listed. The indicators are assigned to each quality management level and the level of quality is expressed with Sigma values. Through this quality performance management, managers will be able to improve the construction quality by monitoring the major indicators of construction project success and ultimately increase the competitiveness of overall construction organization.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Development and Validation of Active Performance Indicators of Electrical Safety Using Bow-Tie and Bayesian Network Techniques Case Study: Oil and Gas Industries Construction Projects

Background: With the developing use of electricity in all aspects of human life, electricity accidents have also increased. One of the main components of the for the prevention policy, is the safety performance assessment of the organization's or industry's by using appropriate performance indicators with related operations.   Method: This study was a descriptive-analytical of 6 steps inc...

متن کامل

Analysis on Components Complexity During Execution of Construction Projects

Development is the fundamental area in enabling India`s economy and urban and provincial structure. Development is a multi-connected structure where all variables are bury connected and multi-centered. All the three limitations time, expense and quality ought to be adjusted in an improved way, so that no segment gets influenced by dismissing those. The goal of this study is to distinguish the m...

متن کامل

A Comparative Study of Automotive NPD’S Performance Indicators between Industry and University Based Projects in a Developing Country.

New product development (NPD) is described in the literature as the transformation of a market opportunity into a product available for sale [ ]. In the automotive industry, within the context of ISO/TS (the automotive quality management system international standard), consists of Three main phases such as planning, Implementation and sales. There are also five sub phases called “Plan...

متن کامل

Comparative analysis of design/build and design/bid/build project delivery systems in Lebanon

Design/bid/build and design/build are two principal project delivery systems used worldwide. The performance of each project may differ with the type of procurement system used. This study has two aims: firstly, to assess and compare the performance of design/bid/build and design/build projects in Lebanon; secondly, to compare the results with the performance of equivalent systems in the Far Ea...

متن کامل

Developing a Risk Management Model for Banking Software Development Projects Based on Fuzzy Inference System

Risk management is one of the most influential parts of project management that has a major impact on the success or failure of projects. Due to the increasing use of information technology (IT) systems in all fields and the high failure rate of IT projects in software development and production, it is essential to effectively manage these projects is essential. Therefore, this study is aimed t...

متن کامل

Reducing rework and increasing the civil projects quality, through Total Quality Management (TQM), by using the concept of building information modeling (BIM)

One of the important problems in the field of Construction Industry is ‘rework’. It affects time, costs, quality, and almost every criteria of project success. As a result of rework and ineffective use of resources and materials in the workshops, there is always a considerable loss of resources, materials, investments, and workforce-time. Designing and planning through full awareness of clients...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2006