CIFECENTER FOR INTEGRATED FACILITY ENGINEERING Building a Project Ontology with Extreme Collaboration and Virtual Design & Construction

نویسندگان

  • Ana Cristina Bicharra Garcia
  • John Kunz
  • Martin Ekstrom
  • Arto Kiviniemi
چکیده

This paper reports on a laboratory study that uses Virtual Design Construction (VDC) modeling and Extreme Collaboration (XC) for early phase building project design. The process creates a specific project ontology that forms the initial design of a building project. Our project ontology explicitly represents the functional requirements, designed forms, and predicted and observed behaviors of the product, organization and process of the project. With collateral drawings, models, analyses and explanations, it becomes the schematic and initial detailed design for the project. We observed a group of six designers (experienced graduate students) developing a first draft project proposal bid for a real project scenario. They created a high-level project model containing about 40 product, organization and process objects that represented their solution to the problem specification. They created and documented a design in one day at a level of detail that often takes engineers weeks to establish using traditional processes. For simplicity, we represented the evolving ontology in Excel and projected it and the corresponding product, organization and process models for all to see in the design meeting. While large generic building project ontologies exist, e.g., the Industry Foundation Classes, we find that our ontology is so simple that teams using any design tools and methods can use it today, and it is helpful. We interpret our results as early evidence that the Tripod engineering process of VDC, XC and use of a generic project ontology together enable a design team to build an ontology for a new project design very rapidly. It can then be used to support downstream detailed design and construction planning and also reuse in other engineering projects.

منابع مشابه

Building a project ontology with extreme collaboration and virtual design and construction

This paper defines the concept of the ‘tripod’ method of design that uses VDC modeling (multi-disciplinary performance-based virtual design and construction modeling), an integrated POP model (a formal and integrated model of Product, Organization and Process of the project) and Extreme Collaboration (a very rapid concurrent and technologically enabled social process of design). The paper focus...

متن کامل

CIFECENTER FOR INTEGRATED FACILITY ENGINEERING Can You Accelerate Your Project Using Extreme Collaboration? A Model Based Analysis

This paper sets out our observations, modeling results, and conclusions regarding a novel organizational form applied variously as “extreme collaboration” (XC) or “radical collocation.” XC teams are cross-functional, co-located groups enabled with high-performance computer modeling and simulation tools, large interactive graphic displays, a mature shared generic project model that the design te...

متن کامل

CIFECENTER FOR INTEGRATED FACILITY ENGINEERING A Formal Identification and Re-sequencing Process for Rapid Generation of Sequencing Alternatives in CPM Schedules

Construction planners face many scheduling challenges during the course of a project. Limitations in time and resources frequently require planners to re-sequence existing activity sequences to expedite milestone or bottleneck activities. Re-sequencing activities within a CPM network, however, is time-consuming and error-prone because planners find it difficult to know which activities may be d...

متن کامل

A Conceptual Framework For Multi-Modal Interactive Virtual Workspaces

SUMMARY: Construction projects involve a large number of both direct stakeholders (clients, professional teams, contractors, etc.) and indirect stakeholders (local authorities, residents, workers, etc.). Current methods of communicating building design information can lead to several types of difficulties (e.g. incomplete understanding of the planned construction, functional inefficiencies, ina...

متن کامل

CIFECENTER FOR INTEGRATED FACILITY ENGINEERING Formalization of Construction Sequencing Rationale & Classification Mechanism to Support Rapid Generation of Sequencing Alternatives

The ability to re-sequence activities is a critical task for project planners for effective project control. Re-sequencing activities requires planners to determine the impact or “role” an activity has on following activities. They also need to determine which activities may or may not be delayed. Distinguishing the role and “status” (i.e., whether an activity may be delayed) of activities in t...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

متن کامل
عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2003