Analysis and Solution of Non - preemptive Poli iesfor

نویسندگان

  • Sung-Il Kang
  • Heung-Kyu Lee
چکیده

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

A Non-Preemptive Two-Class M/M/1 System with Prioritized Real-Time Jobs under Earliest-Deadline-First Policy

This paper introduces an analytical method for approximating the performance of a two-class priority M/M/1 system. The system is fully non-preemptive. More specifically, the prioritized class-1 jobs are real-time and served with the non-preemptive earliest-deadline-first (EDF) policy, but despite their priority cannot preempt any non real-time class-2 job. The waiting class-2 jobs can only be s...

متن کامل

A Multiprocessor System with Non-Preemptive Earliest-Deadline-First Scheduling Policy: A Performability Study

This paper introduces an analytical method for approximating the performability of a firm realtime system modeled by a multi-server queue. The service discipline in the queue is earliestdeadline- first (EDF), which is an optimal scheduling algorithm. Real-time jobs with exponentially distributed relative deadlines arrive according to a Poisson process. All jobs have deadlines until the end of s...

متن کامل

MULTI-OBJECTIVE OPTIMIZATION WITH PREEMPTIVE PRIORITY SUBJECT TO FUZZY RELATION EQUATION CONSTRAINTS

This paper studies a new multi-objective fuzzy optimization prob- lem. The objective function of this study has dierent levels. Therefore, a suitable optimized solution for this problem would be an optimized solution with preemptive priority. Since, the feasible domain is non-convex; the tra- ditional methods cannot be applied. We study this problem and determine some special structures related...

متن کامل

Modeling and Solution Procedure for a Preemptive Multi-Objective Multi-Mode Project Scheduling Model in Resource Investment Problems

In this paper, a preemptive multi-objective multi-mode project scheduling model for resource investment problem is proposed. The first objective function is to minimize the completion time of project (makespan);the second objective function is to minimize the cost of using renewable resources. Non-renewable resources are also considered as parameters in this model. The preemption of activities ...

متن کامل

Designing a Single Stage Acceptance Sampling Plan Based on the Control Threshold Poli

 In this research, a new control policy for the acceptance sampling problem is introduced. Decision is made based on the number of defectives items in an inspected batch. The objective of the model is to find a constant control level that minimizes the total costs, including the cost of rejecting the batch, the cost of inspection and the cost of defective items. The optimization is performed by...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 1998