Understanding the Timetable Planning Process as a Closed Control Loop

نویسندگان

  • Marco Luethi
  • Daniel Huerlimann
  • Andrew Nash
چکیده

This paper describes how the combined use of OpenTimeTable, a schedule analysis program, and OpenTrack, a railroad network simulation program, can be used to help develop more robust timetables. The paper describes how these programs and additional statistical analysis was used to help identify causes of delay and evaluate solutions for reducing this delay on Zurich’s suburban rail network. OpenTimeTable was used to identify trains susceptible to delays, as well as network bottlenecks and conflict points using actual operating data. Results of this analysis were then used in OpenTrack to complete a microscopic simulation of the network to understand and visualize the dependencies and delay patterns. The paper describes both the OpenTimeTable and OpenTrack programs in detail. Finally, the paper suggests that using a Web Services approach to combining the existing analysis and network simulation applications with a schedule optimization program through RailML based data transfers might be the most efficient way to automate the railroad schedule development process and lead to improved railroad schedules.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

A new multi-product closed-loop supply chain network design in dairy industry

Nowadays, manufacturers need to satisfy consumer demands in order to compete in the real world. This requires the efficient operation of supply chain planning. On the other hand, increasing worldwide environmental, lack of food resources and social concerns are motivating manufacturers and consumers to implement recycling strategies such as product recovery, waste management, or usage of recycl...

متن کامل

Mathematical Formulation and Solving of Green Closed-loop Supply Chain Planning Problem with Production, Distribution and Transportation Reliability

In this paper, developed a new multi-product, multi-period, and multi-level closed-loop green supply chain planning model under uncertain conditions. The formulated model consists of five objective functions, which minimize the cost of the supply chain, minimize the CO2 emission of transportation vehicles, maximize the reliability of manufacturing and distribution centers, maximize t...

متن کامل

Sustainable closed-loop supply chain network design and operations planning considering human resource employment and training

Modeling and optimal solving of supply chain management problems lead to efficient decision making in strategic planning and supply chain operations, resulting in a competitive advantage. Today, with the planning of a sustainable supply chain, in addition to achieving economic goals, it is possible to meet social and environmental objectives and considerations. This research deal with sustainab...

متن کامل

Dynamic Load Carrying Capacity of Mobile-Base Flexible-Link Manipulators: Feedback Linearization Control Approach

This paper focuses on the effects of closed- control on the calculation of the dynamic load carrying capacity (DLCC) for mobile-base flexible-link manipulators. In previously proposed methods in the literature of DLCC calculation in flexible robots, an open-loop control scheme is assumed, whereas in reality, robot control is achieved via closed loop approaches which could render the calculated ...

متن کامل

Impact of government’s policies on competition of two closed-loop and regular supply chains

With progressing technologies and new features of production, new products compete with older ones in markets. Indeed, new products initiate contest with olden ones and this process repeats in different productions lifetime several times. In this situation recycling the olden products seems to be significant for supply chains. Governments often levy special tariffs for these products as a contr...

متن کامل

Control of Flexible Link Robot using a Closed Loop Input-Shaping Approach

This paper is has addressed the Single Flexible Link Robot. The dynamical model is derived using Euler-Lagrange equation and then a proper controller is designed to suppress a  vibration based-on Input-Shaping (IS) method. But, IS control method is an open loop strategy. Due to the weakness of open loop control systems, a closed loop IS control system is proposed. The achieved closed loop c...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2005