Parallel Genetic Algorithms for Optimizing Resource Utilization in Large-Scale Construction Projects

نویسندگان

  • Amr Kandil
  • Khaled El-Rayes
چکیده

This paper presents the development of a parallel multiobjective genetic algorithm framework to enable an efficient and effective optimization of resource utilization in large-scale construction projects. The framework incorporates a multiobjective optimization module, a global parallel genetic algorithm module, a coarse-grained parallel genetic algorithm module, and a performance evaluation module. The framework is implemented on a cluster of 50 parallel processors and its performance was evaluated using 183 experiments that tested various combinations of construction project sizes, numbers of parallel processors and genetic algorithm setups. The results of these experiments illustrate the new and unique capabilities of the developed parallel genetic algorithm framework in: 1 Enabling an efficient and effective optimization of large-scale construction projects; 2 achieving significant computational time savings by distributing the genetic algorithm computations over a cluster of parallel processors; and 3 requiring a limited and feasible number of parallel processors/computers that can be readily available in construction engineering and management offices. DOI: 10.1061/ ASCE 0733-9364 2006 132:5 491 CE Database subject headings: Algorithms; Construction management; Computer aided scheduling; Computation; Information technology IT ; Computer models; Contracts.

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Concurrent control on resource planning and revenue/expenditure estimation in large-scale shell material embankment projects management using discrete-event simulation

Resource planning in large-scale construction projects has been a complicated management issue requiring mechanisms to facilitate decision making for managers. In the present study, a computer-aided simulation model is developed based on concurrent control of resources and revenue/expenditure. The proposed method responds to the demand of resource management and scheduling in shell material emb...

متن کامل

OPTIMAL OPERATORS OF GENETIC ALGORITHM IN OPTIMIZING SEGMENTAL PRECAST CONCRETE BRIDGES SUPERSTRUCTURE

Bridges constitute an expensive segment of construction projects; the optimization of their designs will affect their high cost. Segmental precast concrete bridges are one of the most commonly serviced bridges built for mid and long spans. Genetic algorithm is one of the most widely applied meta-heuristic algorithms due to its ability in optimizing cost. Next to providing cost optimization of t...

متن کامل

A stochastic model for project selection and scheduling problem

Resource limitation in zero time may cause to some profitable projects not to be selected in project selection problem, thus simultaneous project portfolio selection and scheduling problem has received significant attention. In this study, budget, investment costs and earnings are considered to be stochastic. The objectives are maximizing net present values of selected projects and minimizing v...

متن کامل

A MULTI-OBJECTIVE DECENTRALIZED MULTIPLE CONSTRUCTION PROJECTS SCHEDULING PROBLEM CONSIDERING PERIODIC SERVICES AND ORDERING POLICIES

In decentralized construction projects, costs are mostly related to investment, material, holding, logistics, and other minor costs for implementation. For this reason, simultaneous planning of these items and appropriate scheduling of activities can significantly reduce the total costs of the project undertaken. This paper investigates the decentralized multiple construction projects schedulin...

متن کامل

The resource-constraint project scheduling problem of the project subcontractors in a cooperative environment: Highway construction case study

Large-scale projects often have several activities which are performed by subcontractors with limited multi-resources. Project scheduling with limited resources is one of the most famous problems in the research operations and optimization cases. The resource-constraint project scheduling problem (RCPSP) is a NP-hard problem in which the activities of a project must be scheduled to reduce the p...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2006