Two-Machine Flowshop Batching and Scheduling

نویسندگان

  • Bertrand M. T. Lin
  • T. C. Edwin Cheng
چکیده

We consider in this paper a two-machine flowshop scheduling problem in which the first machine processes jobs individually while the second machine processes jobs in batches. The forming of each batch on the second machine incurs a constant setup time. The objective is to minimize the makespan. This problem was previously shown to be NP-hard in the ordinary sense. In this paper, we first present a strong NP-hardness result of the problem. We also identify a polynomially solvable case with either anticipatory or non-anticipatory setups. We then establish a property that an optimal solution for the special case is a lower bound for the general problem. To obtain near-optimal solutions for the general problem, we devise some heuristics. The lower bound is used to evaluate the quality of the heuristic solutions. Results of computational experiments reveal that the heuristics produce solutions with small error ratios. They also suggest that the lower bound is close to the optimal solution.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Appling Metaheuristic Algorithms on a Two Stage Hybrid Flowshop Scheduling Problem with Serial Batching (RESEARCH NOTE)

In this paper the problem of serial batch scheduling in a two-stage hybrid flow shop environment with minimizing Makesapn is investigated. In serial batching it is assumed that jobs in a batch are processed serially, and their completion time is defined to be equal to the finishing time of the last job in the batch. The analysis and implementation of the prohibited transference of jobs among th...

متن کامل

A Two-Stage Hybrid Flowshop Scheduling Problem with Serial Batching

In this paper the problem of serial batch scheduling in a two-stage hybrid flow shop environment with minimizing Makesapn is studied. In serial batching it is assumed that jobs in a batch are processed serially, and their completion time is defined to be equal to the finishing time of the last job in the batch. The analysis and implementation of the prohibited transference of jobs among the mac...

متن کامل

Batch Scheduling on Two-Machine Flowshop with Machine-Dependent Setup Times

The recent survey paper “A Survey on Scheduling Problems with Setup Times and Costs” 1 , classifies batch scheduling problems into those with batching and nonbatching considerations, with sequence-independent and sequence-dependent setup times, and according to the machine environment and the objective function. The survey contains approximately 300 references, a clear indication of the importa...

متن کامل

Two-machine flowshop scheduling problems involving a batching machine with transportation or deterioration consideration

This paper considers two scheduling problems for a two-machine flowshop where a single machine is followed by a batching machine. The first problem is that there is a transporter to carry the jobs between machines. The second problem is that there are deteriorating jobs to be processed on the single machine. For the first problem with minimizing the makespan, we formulate it as a mixed integer ...

متن کامل

Flowshop scheduling problems with transportation or deterioration between the batching and single machines

0360-8352/$ see front matter 2008 Elsevier Ltd. A doi:10.1016/j.cie.2008.07.022 * Corresponding author. Tel./fax: +86 24 83680169 E-mail addresses: [email protected] (L. Tang In this paper, we consider two new types of the two-machine flowshop scheduling problems where a batching machine is followed by a single machine. The first type is that normal jobs with transportation between machin...

متن کامل

MILP models and valid inequalities for the two-machine permutation flowshop scheduling problem with minimal time lags

In this paper, we consider the problem of scheduling on two-machine permutation flowshop with minimal time lags between consecutive operations of each job. The aim is to find a feasible schedule that minimizes the total tardiness. This problem is known to be NP-hard in the strong sense. We propose two mixed-integer linear programming (MILP) models and two types of valid inequalities which aim t...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:
  • Annals OR

دوره 133  شماره 

صفحات  -

تاریخ انتشار 2005