Mine Planning – Its relationship to Risk Management

نویسنده

  • O. K. H. Steffen
چکیده

Mine planning is a typical engineering design function which integrate the disciplines of geology, metallurgy, geotechnics, mining and economics. The numerous uncertainties associated with geological understanding, the exposure of people to potential hazards in the work place and the need to provide a specific dollar outcome, requires a proper assessment of the risk. This paper identifies the sources of risk and suggests a rigorous methodology that can be followed to include risk management into the mine planning discipline. Techniques used in other engineering disciplines have been incorporated in this application to open pit mining. The responsibility of risk tolerance needs to be clearly defined by the directors of the mining company to allow the planning engineers to deliver an acceptable design.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

A practical approach to open-pit mine planning under price uncertainty using information gap decision theory

In the context of open-pit mine planning, uncertainties including commodity price would significantly affect the technical and financial aspects of mining projects. A mine planning that takes place regardless of the uncertainty in price just develops an optimized plan at the starting time of the mining operation. Given the price change over the life of mine, which is quite certain, optimality o...

متن کامل

Path Planning for Mine Countermeasures Command and Control

The future success of Navy-Marine Corps operations in the extended littoral battlespace will depend critically on organic mine countermeasure capabilities. A battlegroup commander will require tools to rapidly detect, classify, and identify mines and form a tactical picture of mined areas, so a decision can be made to punch through the minefield, avoid it, or wait for dedicated mine countermeas...

متن کامل

Analyzing the effect of ore grade uncertainty in open pit mine planning; A case study of Rezvan iron mine, Iran

Due to uncertain nature of grade in ore deposits, considering uncertainty is inevitable in geological modelling of resources and mine planning. In other words, uncertainty in grade of mineralized materials, is one of the most significant parameters need attention in mine planning. In this paper, a comparative procedure utilizing Sequential Gaussian Simulation (SGS) and traditional Ordinary Krig...

متن کامل

The Future of Mine Planning Software – New Tools and Innovations

Modern mine planning software plays a crucial role in the operation of many of the world’s mining operations and projects. Mine planning software provides the mining industry with a fast, accurate, cost effective and efficient tool in order to manage their business interests worldwide. Every aspect of the mining industry is today using some form of mine planning software. From exploration to re...

متن کامل

The Assessment of the Community Capacity on the Urban Vulnerability Based on Community Disaster Risk Management (CBDRM) (Case Study : Yousef-Abad, Tehran City)

Disaster Management and current approaches in this field in one hand only has focused to physicalvulnerabilities and in the other hand has included consequential action to reduce vulnerability and improve physicalpreparation as well as resistance institutional insignificant during the disaster. Therefore, these approaches usually haveignored the capabilities and capacities of residents to reduc...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2007