A Prediction Model of the Project Life-span in Open Source Software Ecosystem
نویسندگان
چکیده
In nature ecosystems, animal life-spans are determined by genes and some other biological characteristics. Similarly, the software project life-spans are related to some internal or external characteristics. Analyzing the relations between these characteristics and the project life-span, may help developers, investors, and contributors to control the development cycle of the software project. The paper provides an insight on the project life-span for a free open source software ecosystem. The statistical analysis of some project characteristics in GitHub is presented, and we find that the choices of programming languages, the number of files, the label format of the project, and the relevant membership expressions can impact the life-span of a project. Based on these discovered characteristics, we also propose a prediction model to estimate the project life-span in open source software ecosystems. These results may help developers reschedule the project in open source software ecosystem.
منابع مشابه
Providing a Model for Cost Estimation of Hospital Information System Software Design Using Continuous Decision Tree Algorithm
Introduction: The cost estimation of a hospital information system software refers to estimating the cost and time required to develop the hospital information system software prior to the start of the project, which will continue until the end of production and development of the system. Estimating the cost of software to produce hospital information system is one of the major concerns of proj...
متن کاملProviding a Model for Cost Estimation of Hospital Information System Software Design Using Continuous Decision Tree Algorithm
Introduction: The cost estimation of a hospital information system software refers to estimating the cost and time required to develop the hospital information system software prior to the start of the project, which will continue until the end of production and development of the system. Estimating the cost of software to produce hospital information system is one of the major concerns of proj...
متن کاملTUNNEL BORING MACHINE PENETRATION RATE PREDICTION BASED ON RELEVANCE VECTOR REGRESSION
key factor in the successful application of a tunnel boring machine (TBM) in tunneling is the ability to develop accurate penetration rate estimates for determining project schedule and costs. Thus establishing a relationship between rock properties and TBM penetration rate can be very helpful in estimation of this vital parameter. However, this parameter cannot be simply predicted since there ...
متن کاملAn Exploratory Study of Duplicate Bug Reports in Oss Projects
Open Source Software (OSS) uses open bug repository during development and maintenance, so that both developer and user can reports bugs that they have found. These systems are generally called as bug tracking system or bug repositories. Bug tracking system is open bug repository that is maintained by open source software organizations to track their bugs. In OSS bug reports from all over the w...
متن کاملMeasuring the health of open source software ecosystems: Beyond the scope of project health
Background: The livelihood of an open source ecosystem is important to different ecosystem participants: software developers, end-users, investors, and participants want to know whether their ecosystem is healthy and performing well. Currently, there exists no working operationalization available that can be used to determine the health of open source ecosystems. Health is typically looked at f...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید
ثبت ناماگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید
ورودعنوان ژورنال:
- CoRR
دوره abs/1710.11540 شماره
صفحات -
تاریخ انتشار 2017