0 - 521 - 51851 - 2 - Stochastic Scheduling
نویسندگان
چکیده
absolute deviation, 15, 29 absolute deviation robust schedule, 27 Absolute Deviation Robust Scheduling Problem, 13, 17, 27 absolute robust single-machine sequence, 16 activity duration, 145, 151 activity network, 143, 146, 154 activity-on-arc network, 143, 149–151 activity-on-node network, 144, 148 agile, 8 agility, 1 almost surely smallest sequence, 8 analytical expression, 94 approximation algorithm, 149 approximation procedure, 147 approximations of expectation and variance, 114, 143 arbitrary probability distribution, 43 assembly system, 68 assignment problem structure, 15 assignment problem with a single side constraint, 14 asymptotic property, 96
منابع مشابه
Operating Room Scheduling in Teaching Hospitals: A Novel Stochastic Optimization Model
Background and Objectives: Operating room (OR) scheduling is key to optimal operating room productivity. The significant uncertainty associated with surgery duration renders scheduling of surgical operation a challenging task. This paper proposes a novel computational stochastic model to optimize scheduling of surgeries with uncertain durations. The model considers various surgical operation co...
متن کاملA stochastic model for project selection and scheduling problem
Resource limitation in zero time may cause to some profitable projects not to be selected in project selection problem, thus simultaneous project portfolio selection and scheduling problem has received significant attention. In this study, budget, investment costs and earnings are considered to be stochastic. The objectives are maximizing net present values of selected projects and minimizing v...
متن کاملEnergy Scheduling in Power Market under Stochastic Dependence Structure
Since the emergence of power market, the target of power generating utilities has mainly switched from cost minimization to revenue maximization. They dispatch their power energy generation units in the uncertain environment of power market. As a result, multi-stage stochastic programming has been applied widely by many power generating agents as a suitable tool for dealing with self-scheduling...
متن کاملA Stochastic Model for Prioritized Outpatient Scheduling in a Radiology Center
This paper discussed the scheduling problem of outpatients in a radiology center with an emphasis on priority. To more compatibility to real-world conditions, we assume that the elapsed times in different stages to be uncertain that follow from the specific distribution function. The objective is to minimize outpatients’ total spent time in a radiology center. The problem is formulated as a fle...
متن کاملStochastic Short-Term Hydro-Thermal Scheduling Based on Mixed Integer Programming with Volatile Wind Power Generation
This study addresses a stochastic structure for generation companies (GenCoʼs) that participate in hydro-thermal self-scheduling with a wind power plant on short-term scheduling for simultaneous reserve energy and energy market. In stochastic scheduling of HTSS with a wind power plant, in addition to various types of uncertainties such as energy price, spinning /non-spinning reserve prices, unc...
متن کامل