Fuzzy multi-objective project management decisions using two-phase fuzzy goal programming approach

نویسنده

  • Tien-Fu Liang
چکیده

0360-8352/$ see front matter 2009 Elsevier Ltd. A doi:10.1016/j.cie.2009.07.010 * Tel.: +886 4 24961123x1409; fax: +886 4 249611 E-mail address: [email protected] In practical project management (PM) decision problems, environmental coefficients and related parameters are frequently fuzzy in nature, and a decision maker (DM) must simultaneously consider various conflicting objectives in a framework of imprecise aspiration levels. This work focuses on developing a two-phase fuzzy mathematical programming (TPFGP) approach for solving the multi-objective PM decision problems in a fuzzy environment. The original fuzzy multi-objective programming model designed here attempts to simultaneously minimize total project costs, total completion time and total crashing costs with reference to direct costs, indirect costs, contractual penalty costs, duration of activities and the constraint of available budget. An industrial case is used to demonstrate the feasibility of applying the proposed approach to real-world PM decisions. Consequently, the proposed approach yields an efficient solution and overall degree of decision maker (DM) satisfaction with the determined goal values. Several significant management implications relating to the practical application of the proposed approach are also presented. Overall, the main contribution of this work lies in presenting a two-phase fuzzy programming methodology for solving real-world PM decision problems with multiple objectives. 2009 Elsevier Ltd. All rights reserved.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

A fuzzy multi-objective model for a project management problem

In this research, the multi-objective project management decision problem with fuzzy goals and fuzzy constraints are considered. We constitute α-cut approach and two various fuzzy goal programming solution methods for solving the Multi-Objective Project Management (MOPM) decision problem under fuzzy environments. The Interactive fuzzy multi-objective linear programming (i-FMOLP) and Weighted Ad...

متن کامل

Adaptive aggregate production planning with fuzzy goal programming approach

Aggregate production planning (APP) determines the optimal production plan for the medium term planning horizon. The purpose of the APP is effective utilization of existing capacities through facing the fluctuations in demand. Recently, fuzzy approaches have been applied for APP focusing on vague nature of cost parameters. Considering the importance of coping with customer demand in different p...

متن کامل

Fuzzy Multi-Objective Linear Programming for Project Management Decision under Uncertain Environment with AHP Based Weighted Average Method

Smooth implementation and controlling conflicting goals of a project with the usage of all related resources through organization is inherently a complex task to management. At the same time deterministic models are never efficient in practical project management (PM) decision problems because the related parameters are frequently fuzzy in nature. The project execution time is a major concern o...

متن کامل

Applying fuzzy goal programming to project management decisions with multiple goals in uncertain environments

In real-life situations, the project manager must handle multiple conflicting goals and these conflicting goals are normally fuzzy owing to information is incomplete and unavailable. This study develops a two-phase fuzzy goal programming (FGP) method for solving the project management (PM) decision problems with multiple goals in uncertain environments. The original multi-objective linear progr...

متن کامل

Applying fuzzy multi-objective linear programming to project management decisions with the interactive two-phase method

The aim of this paper is to develop an interactive two-phase method that can help the Project Manager (PM) with solving the fuzzy multi-objective decision problems. Therefore, in this paper, we first revisit the related papers and focus on how to develop an interactive two-phase method. Next, we establish to consider the imprecise nature of the data by fulfilling the possibilistic programming m...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:
  • Computers & Industrial Engineering

دوره 57  شماره 

صفحات  -

تاریخ انتشار 2009