Earned - Value Management Terminology
نویسندگان
چکیده
To the Editor: Although I enjoyed the article titled “Value-Based Software Engineering: A Case Study” (Barry Boehm and Li Guo Huang, March 2003, pp. 33-41), as a newly minted Project Management Professional and a contributor to the Project Management Institute’s Earned Value Analysis team, I was disappointed with the authors’ use of nonstandard terminology. The authors renamed the traditional terms BCWS (budgeted cost of work scheduled) and BCWP (budgeted cost of work performed) as EV scheduled and EV performed, respectively. They did not mention the third primary term, ACWP (actual cost of work performed), at all. The earned-value management process is already confusing to many people. In an effort to help dispel this confusion, the 2000 edition of PMI’s body of knowledge replaced the terms BCWS with PV (planned value), BCWP with EV (earned value), and ACWP with AC (actual cost). Using this standard terminology will encourage clarity as project managers seek to establish discipline in software-intensive projects. James T. Heires Cedar Rapids, Iowa [email protected]
منابع مشابه
Estimation of Project Performance Using Earned Value Management and Fuzzy Regression
Earned Value Management is a critical project managementmethodology that evaluates project performance from cost andschedule viewpoints. The novel theoretical framework presented in thispaper estimates future performance of project regarding the past relativeinformation. It benefits from fuzzy regression (FR) models in estimationprocess in order to deal with the vagueness and impreciseness ofre...
متن کاملAn Extension of the Earned Value Management to Improve the Accuracy of Schedule Analysis Results
A project is any endeavor involving planned action, for example, developing a new product or constructing a dam. [CE1] Major factors for a project to be successful are applying performance measurement and feedback tool. One such well-known performance measurement tool to control the project execution is earned value management (EVM). EVM uses the fundamental principle that trends in the past ca...
متن کاملEstablishing Control Limits on Time Performance Indicators of Projects through Monte Carlo Simulation and Earned Duration Management
Earned Duration Management (EDM) method has been developed to enhance Earned Value Management and to solve some of its problems, such as separation of measuring time and cost dimensions. By providing performance indicators, this method makes it possible for managers to accurately measure the progress of a project and to calculate the time and cost required to complete it. Nevertheless, the acce...
متن کاملSelf-Starting Control Chart and Post Signal Diagnostics for Monitoring Project Earned Value Management Indices
Earned value management (EVM) is a well-known approach in a project control system which uses some indices to track schedule and cost performance of a project. In this paper, a new statistical framework based on self-starting monitoring and change point estimation is proposed to monitor correlated EVM indices which are usually auto-correlated over time and non-normally distributed. Also, a new ...
متن کاملPredicting project time and costs using earned value management based on trapezoidal fuzzy numbers
Projects include activities that must be carried out at certain dates, with specified costs and determined qualities in order to satisfy the stakeholders. Project control is one of the most important and widely used issues in project-based organizations and it has attracted a lot of attention. So far, in the field of project control, there have been a lot of research that were done in different...
متن کامل