Simulation of Bored Pile Construction

نویسندگان

  • Tarek M. Zayed
  • Daniel W. Halpin
چکیده

The installation of pile foundations is complicated by an enormous number of problems. They include unseen subsurface obstacles, lack of contractor experience, and site planning. These major problems and other minor ones make it difficult for the estimator to evaluate the piling project productivity and cost. Therefore, this study is designed to assess these problems using simulation. Both piling process productivity and cycle time assessment are addressed. Data were collected for this study through designed questionnaires, site interviews, and telephone calls to experts in different construction companies. Many variables have been considered in the piling construction process. Two simulation models have been designed and validated to assess piling process productivity and cycle time. Consequently, two sets of charts have been developed based upon the validated models to provide the decision-maker with a solid planning, scheduling and control tool for piling projects.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Soft Foundation Strengthening Effect and Structural Optimization of a New Cement Fly-ash and Gravel Pile-slab Structure

Reducing the settlements of soft foundation effectively is a critical problem of high-speed railway construction in China. The new CFG pile-slab structure composite foundation is a ground treatment technique which is applied on CFG pile foundation and pile-slab structure composite foundation. Based on the experience of constructing Beijing-Shanghai high-speed railway in China, the settlement-co...

متن کامل

Numerical analysis of tunnels and deep excavations

This report covers 33 papers submitted to the session Numerical Analysis of Tunnels and Deep Excavations. The majority of papers (26) addresses aspects related to tunnelling, both NATM and bored tunnels. As compared to previous conferences analysis of interaction between tunnel construction and surrounding structures such as buildings and pile foundations seems to have become more important. On...

متن کامل

New Analytic Method for Subgrade Settlement Calculation of the New Cement Fly-ash Grave Pile-slab Structure

At present, reducing subgrade settlement of soft soil foundation is a key problem in high-speed railway construction. Pile-slab structure is a widely-utilized form of foundation structure to reduce the subgrade settlement in China. In order to save the engineering cost for high-speed railway construction in developing countries, the author developed a pile-slab structure and named it as the new...

متن کامل

Assessment of load-carrying capacity of bored pile in clay soil using different methods

It is very difficult to predict the load carrying capacity of bored piles because of the Complications that may arise such as difficult ground conditions , presence of ground water, method of boring, method of concreting, quality of concrete, expertise of the construction staff, the ground conditions and the pile geometry. Therefore the Pile design must be accompanied by in situ load testing. M...

متن کامل

Prediction of End Bearing Capacity for Pre-Bored Steel Pipe Piles Using Instrumented Spt Rods

The standard penetration test (SPT) has been widely used because of its usability, economy, and many correlations with soil properties among other factors. In SPT, hammer energy is an important factor to evaluate and calibrate N values. To measure hammer energy, an instrumented SPT rod was developed considering that stress waves transferring on rods during SPT driving are the same as stress wav...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2004