To build...or not to build.
نویسنده
چکیده
Copyright © by Houghton Mifflin Harcourt Publishing Company All rights reserved. No part of this work may be reproduced or transmitted in any form or by any means, electronic or mechanical, including photocopying or recording, or by any information storage or retrieval system, without the prior written permission of the copyright owner unless such copying is expressly permitted by federal copyright law. Permission is hereby granted to individual teachers using the corresponding (discipline) Leveled Readers to photocopy student worksheets from this publication in classroom quantities for instructional use and not for resale. Requests for information on other matters regarding duplication of this work should be addressed to Houghton Miffl in Harcourt Publishing Company, Attn: Contracts, Copyrights, and Licensing, 9400 SouthPark Center Loop, Orlando, Florida 32819. Printed in the U.S.A. 978-0-547-30811-1 1 2 3 4 5 6 7 8 9 10 0940 15 14 13 12 11 10 09
منابع مشابه
Benders decomposition algorithm for a green closed-loop supply chain under a build-to-order environment
Nowadays, researches pay more attention to environmental concerns consisted of various communities. This study proposes a multi-echelon, multi-period closed-loop supply chain (CLSC). A comprehensive model considers the selection of selection of technology and environmental effects. The supply chain is under a build-to-order (BTO) environment. So, there is not a final product inventory. Also, th...
متن کاملVocabulary Instruction Method and Specialized Reading Comprehension: Build a Bridge or Wash it away
The present study aimed to examine and compare the impact of teaching economic terms through etymological elaboration with three more conventional methods of vocabulary instruction in ESP courses in Iran, that is, teaching through contextual definitions, L1 translation, and implicit instruction on the learners' general comprehension of economic texts and their understanding of author's opinion....
متن کاملComparative analysis of design/build and design/bid/build project delivery systems in Lebanon
Design/bid/build and design/build are two principal project delivery systems used worldwide. The performance of each project may differ with the type of procurement system used. This study has two aims: firstly, to assess and compare the performance of design/bid/build and design/build projects in Lebanon; secondly, to compare the results with the performance of equivalent systems in the Far Ea...
متن کاملMeasurements of output factors using different ionization chambers and build up caps
Background: The aim of this work was to study the output factors for Linac using different ionization chambers and build up caps. Materials and Methods: Output factors were measured for open square fields (3 × 3 cm to 40 × 40 cm) defined by collimator jaws for 6 and 15 MV photon beams from a Varian Clinac 2100C accelerator were measured. The measurements in air were performed using Com...
متن کاملDetermination of Concession Period in Build-Operate-Transfer Projects Using Fuzzy Logic
The build-operate-transfer (BOT) projects are a popular method of privatization of public infrastructure development. There are several risks which might affect a BOT project negatively. Concession period is one of the most important decision variables in arranging a BOT-type contract which should be determined considering the existing risks and uncertainties. A longer concession period is more...
متن کاملLongevity of Amalgam Build-Up Restorations in Endodontically Treated Teeth
Background and Aim: Restoration of endodontically treated teeth is one of the most important and challenging topics in restorative dentistry. Longevity of such restorations is an essential factor in treatment planning. Amalgam build-up is a conservative method for restoration of endodontically treated teeth. Therefore, this study aimed to assess the longevity of this type of restoration in endo...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید
ثبت ناماگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید
ورودعنوان ژورنال:
- Dentalpractice
دوره 2 5 شماره
صفحات -
تاریخ انتشار 1968