Parallel machine match-up scheduling with manufacturing cost considerations
نویسندگان
چکیده
Many scheduling problems in practice involve rescheduling of disrupted schedules. In this study, we show that in contrast to fixed processing times, if we have the flexibility to control the processing times of the jobs, we can generate alternative reactive schedules considering the manufacturing cost implications in response to disruptions. We consider a non-identical parallel machining environment where processing times of the jobs are compressible at a certain manufacturing cost, which is a convex function of the compression on the processing time. In rescheduling it is highly desirable to catch up the original schedule as soon as possible by reassigning the jobs to the machines and compressing their processing times. On the other hand, one must also keep the manufacturing cost due to compression of the jobs low. Thus, one is faced with a tradeoff between matchup time and manufacturing cost criteria. We introduce alternative match-up scheduling problems for finding schedules on the efficient frontier of this time/cost tradeoff. We employ the recent advances in conic mixed-integer programming to model these problems effectively. We further provide a fast heuristic algorithm driven by dual prices of convex subproblems for generating approximate efficient schedules. M.S. Aktürk ( ) · S. Gürel Department of Industrial Engineering, Bilkent University, 06800 Bilkent, Ankara, Turkey e-mail: [email protected] S. Gürel e-mail: [email protected] A. Atamtürk Industrial Engineering & Operations Research Department, University of California, Berkeley, CA 94720-1777, USA e-mail: [email protected]
منابع مشابه
Bi-level Model for Reliability based Maintenance and Job Scheduling
Many defects in manufacturing system are caused by human resources that show the significance of the human resources in manufacturing systems. Most manufacturers attempt to investigate the human resources in order to improve the work conditions and reduce the human error by providing a proper work-rest schedule. On the other hand, manufacturer deal with machine scheduling based on demand and wo...
متن کاملA fuzzy mixed-integer goal programming model for a parallel machine scheduling problem with sequence-dependent setup times and release dates
This paper presents a new mixed-integer goal programming (MIGP) model for a parallel machine scheduling problem with sequence-dependent setup times and release dates. Two objectives are considered in the model to minimize the total weighted flow time and the total weighted tardiness simultaneously. Due to the com-plexity of the above model and uncertainty involved in real-world scheduling probl...
متن کاملAn anticipative scheduling approach with controllable processing times
In practice, machine schedules are usually subject to disruptions which have to be repaired by reactive scheduling decisions. The most popular predictive approach in project management and machine scheduling literature is to leave idle times (time buffers) in schedules in coping with disruptions, i.e. the resources will be under-utilized. Therefore, preparing initial schedules by considering po...
متن کاملTwo-stage fuzzy-stochastic programming for parallel machine scheduling problem with machine deterioration and operator learning effect
This paper deals with the determination of machine numbers and production schedules in manufacturing environments. In this line, a two-stage fuzzy stochastic programming model is discussed with fuzzy processing times where both deterioration and learning effects are evaluated simultaneously. The first stage focuses on the type and number of machines in order to minimize the total costs associat...
متن کاملParallel path relinking method for the single machine total weighted tardiness problem with sequence-dependent setups
We propose a new method of sequential and parallel speeding up of the process of solving a single machine scheduling problem with total tardiness cost function. This improvement is done on two levels: generating a neighborhood inside path relinking method (basing on new approach—blocks in solutions) and parallelization of generating paths. The obtained results are compared to the benchmark ones...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید
ثبت ناماگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید
ورودعنوان ژورنال:
- J. Scheduling
دوره 13 شماره
صفحات -
تاریخ انتشار 2010