An improved heuristic for two-machine flowshop scheduling with an availability constraint

نویسندگان

  • T. C. Edwin Cheng
  • Guoqing Wang
چکیده

In this paper we study the two-machine owshop scheduling problem with an availability constraint on the rst machine. We rst show that the worst-case error bound 2 of the heuristic provided by Lee [4] is tight. We then develop an improved heuristic with a worst-case error bound of 3 . c © 2000 Elsevier Science B.V. All rights reserved.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Heuristics for two-machine flowshop scheduling with setup times and an availability constraint

This paper studies the two-machine flowshop scheduling problem with anticipatory setup times and an availability constraint imposed on only one of the machines where interrupted jobs can resume their operations. We present two heuristics and show that their worst-case error bounds are no larger than 2/3.

متن کامل

Solving Re-entrant No-wait Flexible Flowshop Scheduling Problem; Using the Bottleneck-based Heuristic and Genetic Algorithm

In this paper, we study the re-entrant no-wait flexible flowshop scheduling problem with makespan minimization objective and then consider two parallel machines for each stage. The main characteristic of a re-entrant environment is that at least one job is likely to visit certain stages more than once during the process. The no-wait property describes a situation in which every job has its own ...

متن کامل

An approximation scheme for two-machine flowshop scheduling with setup times and an availability constraint

This paper studies the two-machine permutation flowshop scheduling problem with anticipatory setup times and an availability constraint imposed only on the first machine. The objective is to minimize the makespan. Under the assumption that interrupted jobs can resume their operations, we present a polynomial-time approximation scheme (PTAS) for this problem.

متن کامل

Development of a Set of Algorithms for the Multi-Project Scheduling Problems

In this paper, the problem of determining the best schedule for a set of projects has been modeled in the form of a generalized tardiness flowshop (GTF) problem. We develop a set of heuristic algorithms for minimizing the total tardiness of jobs in a GTF problem. In the generalized version of tardiness flowshop problems, a job is considered to be a collection of operations and there is a due da...

متن کامل

Minimizing the Number of Tardy Jobs in the Single Machine Scheduling Problem under Bimodal Flexible and Periodic Availability Constraints

In single machine scheduling problems with availability constraints, machines are not available for one or more periods of time. In this paper, we consider a single machine scheduling problem with flexible and periodic availability constraints. In this problem, the maximum continuous working time for each machine increases in a stepwise manner with two different values allowed. Also, the durati...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:
  • Oper. Res. Lett.

دوره 26  شماره 

صفحات  -

تاریخ انتشار 2000