Evaluation of Uncertainties of the Null-Balanced Total-Power Radiometer System NCSl

نویسنده

  • Sunchana P. Pucic
چکیده

National Institute of Standards and Technology, Boulder. CO 80303-3328 Standard unrertaintjes are evaluated for the nuU-balarced, total-power, heicrodyned radiometer system with a switched input that was recently developed U NIST lo calibrate thermal noise sources. Eighi significant sources of uncertainty due tw sysletoatic effects arc iiicnlirtcd. two attributable to the two noise standards, and one each lo conncdors, the Inpui n)i!iinatch, the input switch a-^ymmetiy, the isolator, the broadband mismatch and the attenuator. The combined ^tandartl uncertainty of a typical coaxial rtoise source calibration at a representative frequency of 2 GHz is about \%. A strategy for reducing uncertainties W discussed.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Operation Planning of Wind Farms with Pumped Storage Plants Based on Interval Type-2 Fuzzy Modeling of Uncertainties

The operation planning problem encounters several uncertainties in terms of the power system’s parameters such as load, operating reserve and wind power generation. The modeling of those uncertainties is an important issue in power system operation. The system operators can implement different approaches to manage these uncertainties such as stochastic and fuzzy methods. In this paper, new ...

متن کامل

A Probabilistic Approach to Transmission Expansion Planning in Deregulated Power Systems under Uncertainties

Restructuring of power system has faced this industry with numerous uncertainties. As a result, transmission expansion planning (TEP) like many other problems has become a very challenging problem in such systems. Due to these changes, various approaches have been proposed for TEP in the new environment. In this paper a new algorithm for TEP is presented. The method is based on probabilisti...

متن کامل

Stochastic Unit Commitment in the Presence of Demand Response Program under Uncertainties

In this paper, impacts of various uncertainties such as random outages of generating units and transmission lines, forecasting errors of load demand and wind power, in the presence of Demand response (DR) programs on power generation scheduling are studied. The problem is modelled in the form of a two-stage stochastic unit commitment (UC) which by solving it, the optimal solutions of UC as well...

متن کامل

Clean and Polluting DG Types Planning in Stochastic Price Conditions and DG Unit Uncertainties

This study presents a dynamic way in a DG planning problem instead of the last static or pseudo-dynamic planning point of views. A new way in modeling the DG units’ output power and the load uncertainties based on the probability rules is proposed in this paper. A sensitivity analysis on the stochastic nature of the electricity price and global fuel price is carried out through a proposed model...

متن کامل

Optimal Scheduling of Battery Energy Storage System in Distribution Network Considering Uncertainties using hybrid Monte Carlo- Genetic Approach

This paper proposes a novel hybrid Monte Carlo simulation-genetic approach (MCS-GA) for optimal operation of a distribution network considering renewable energy generation systems (REGSs) and battery energy storage systems (BESSs). The aim of this paper is to design an optimal charging /discharging scheduling of BESSs so that the total daily profit of distribution company (Disco) can be maximiz...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2011