An Exploratory Survey of Phase-wise Project Cost Estimation Techniques

نویسنده

  • Peraphon Sophatsathit
چکیده

This article explores a number of existing project cost estimation techniques to investigate how the estimation can be done in a more accurate and effective manner. The survey looks into various estimation models that utilize many theoretical techniques such as statistics, fuzzy logic, case-based reasoning, analogies, and neural networks. As the essence of conventional estimation inaccuracy lies in life cycle cost drivers that are unsuitable to be applied across the project life cycle, this study introduces a phase-wise estimation technique that posits some overhead and latency costs. Performance evaluation methods of the underlying phase-wise principle are also presented. Contributions of this phase-wise approach will improve the estimation accuracy owing to less latency cost and increase the project visibility which in turn helps the project managers better scrutinize and administer project activities.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Bridging the semantic gap for software effort estimation by hierarchical feature selection techniques

Software project management is one of the significant activates in the software development process. Software Development Effort Estimation (SDEE) is a challenging task in the software project management. SDEE is an old activity in computer industry from 1940s and has been reviewed several times. A SDEE model is appropriate if it provides the accuracy and confidence simultaneously before softwa...

متن کامل

مروری بر روش‌های تخمین هزینه نرم‌افزار مبتنی بر یادگیری ماشین

Software project management software is the most important activity in software development, because it contains the whole software development process, from beginning to end. Software cost estimation is a challenge task in the software project management. It is an old activity in computer industry from 1940s and has been developed many times. Effort, only covers part of the cost of a software ...

متن کامل

TBM Tunneling Construction Time with Respect to Learning Phase Period and Normal Phase Period

In every tunnel boring machine (TBM) tunneling project, there is an initial low production phase so-called the Learning Phase Period (LPP), in which low utilization is experienced and the operational parameters are adjusted to match the working conditions. LPP can be crucial in scheduling and evaluating the final project time and cost, especially for short tunnels for which it may constitute a ...

متن کامل

Experimental Evaluation of Algorithmic Effort Estimation Models using Projects Clustering

One of the most important aspects of software project management is the estimation of cost and time required for running information system. Therefore, software managers try to carry estimation based on behavior, properties, and project restrictions. Software cost estimation refers to the process of development requirement prediction of software system. Various kinds of effort estimation patter...

متن کامل

Developing an Integrated Simulation Model of Bayesian-networks to Estimate the Completion Cost of a Project under Risk: Case Study on Phase 13 of South Pars Gas Field Development Projects

Objective: The aim of this paper is to propose a new approach to assess the aggregated impact of risks on the completion cost of a construction project. Such an aggregated impact includes the main impacts of risks as well as the impacts of interactions caused by dependencies among them. Methods: In this study, Monte Carlo simulation and Bayesian Networks methods are combined to present a frame...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2015