Integration of selecting and scheduling urban road construction projects as a time-dependent discrete network design problem
نویسندگان
چکیده
Decision making on the selection of transportation infrastructure projects is an interesting subject to both transportation authorities and researchers. Due to resource limitations, the selected projects should then be scheduled during the planning horizon. Integration of selecting and scheduling projects into a single model increases the accuracy of results; however it leads to more complexity. In this paper, first, three different mathematical programming models are presented to integrate selecting and scheduling of urban road construction projects as a time-dependent discrete network design problem. Then, the model that seems more flexible and realistic is selected and an evolutionary approach is proposed to solve it. The proposed approach is a combination of three well-known techniques: the phase-I of the two-phase simplexmethod, Frank-Wolfe algorithm, and genetic algorithm. Taguchi method is used to optimize the genetic algorithm parameters. The main difficulty in solving the model is due to the large number of subsequent network traffic assignment problems that should be solved which makes the solution process very time-consuming. Therefore, a procedure is proposed to overcome this difficulty by significantly reducing the traffic assignment problem solution time. In order to verify the performance of the proposed approach, 27 randomly generated test problems of different scales are applied to Sioux Falls urban transportation network. The proposed approach and full enumeration method are used to solve the problems. Numerical results show that the proposed approach has an acceptable performance in terms of both solution quality and solution time. © 2015 Elsevier B.V. and Association of European Operational Research Societies (EURO) within the International Federation of Operational Research Societies (IFORS). All rights reserved.
منابع مشابه
A mathematical model for sustainable probabilistic network design problem with construction scheduling considering social and environmental issues
Recent facility location allocation problems are engaged with social, environmental and many other aspects, besides cost objectives.Obtaining a sustainable solution for such problems requires development of new mathematical modeling and optimization algorithms. In this paper, an uncapacitated dynamic facility location-network design problem with random budget constraints is considered. Social i...
متن کاملMulti-objective optimization of time-cost-quality-carbon dioxide emission-plan robustness in construction projects
Today, the construction industry is facing intense competition and success in this competition depends on several factors. Project managers try to minimize project time and cost, carbon dioxide emission and at the same time maximizing the quality of project and its plan robustness. In this paper, study construction project scheduling considering a discrete trade-off between time, cost, quality,...
متن کاملOptimal Capacities in Discrete Facility Location Design Problem
Network location models comprise one of the main categories of location models. These models have various applications in regional and urban planning as well as in transportation, distribution, and energy management. In a network location problem, nodes represent demand points and candidate locations to locate the facilities. If the links network is unchangeably determined, the problem will be ...
متن کاملTime-dependent discrete road network design with both tactical and strategic decisions
This paper aims to model and investigate the discrete urban road network design problem, using a multi-objective time-dependent decision making approach. Given a base network made up with two-way links, candidate link expansion projects, and candidate link construction projects, the problem determines the optimal combination of one-way and two-way links, the optimal selection of capacity expans...
متن کاملA MULTI-OBJECTIVE DECENTRALIZED MULTIPLE CONSTRUCTION PROJECTS SCHEDULING PROBLEM CONSIDERING PERIODIC SERVICES AND ORDERING POLICIES
In decentralized construction projects, costs are mostly related to investment, material, holding, logistics, and other minor costs for implementation. For this reason, simultaneous planning of these items and appropriate scheduling of activities can significantly reduce the total costs of the project undertaken. This paper investigates the decentralized multiple construction projects schedulin...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
عنوان ژورنال:
- European Journal of Operational Research
دوره 246 شماره
صفحات -
تاریخ انتشار 2015