Re-scheduling in railways: the Rolling Stock Balancing Problem
نویسندگان
چکیده
This paper addresses the Rolling Stock Balancing Problem (RSBP). This problem arises at a passenger railway operator when the rolling stock has to be re-scheduled due to changing circumstances. These problems arise both in the planning process and during operations. The RSBP has as input a timetable and a rolling stock schedule where the allocation of the rolling stock among the stations does not fit to the allocation before and after the planning period. The problem is then to correct these off-balances, leading to a modified schedule that can be implemented in practice. For practical usage of solution approaches for the RSBP, it is important to solve the problem quickly. Therefore, the focus is on heuristic approaches. In this paper, we describe two heuristics and compare them with ∗Econometric Institute, Erasmus University Rotterdam, P.O. Box 1738, NL-3000 DR, Rotterdam, The Netherlands. E-mail: {budai,huisman,rdekker}@few.eur.nl. †Rotterdam School of Management, Erasmus University Rotterdam, P.O. Box 1738, NL-3000 DR, Rotterdam, The Netherlands. E-mail: {gmaroti,lkroon}@rsm.nl. ‡Erasmus Center for Optimization in Public Transport (ECOPT). §This work was partially supported by the Future and Emerging Technologies Unit of EC (IST priority 6th FP), under contract no. FP6-021235-2 (project ARRIVAL). ¶Corresponding author.
منابع مشابه
A rolling horizon approach for disruption management of railway rolling stock
This paper deals with real-time disruption management of rolling stock in passenger railway transportation. We describe a generic framework for dealing with disruptions of railway rolling stock schedules. The framework is presented as an online combinatorial decision problem, where the uncertainty of a disruption is modeled by a sequence of information updates. To decompose the problem and to r...
متن کاملProductivity Management in Iranian Railway by Data Envelopment Analysis
Study of various transportation indicators could be an appropriate criterion in evaluating the performance of the existing railways throughout the globe. This study was carried out to investigate the performance of rolling stock of Iranian railway using productivity analysis. In order to solve the problems, some solutions were provided by productivity management cycle steps. At the first step, ...
متن کاملRescheduling in passenger railways: the rolling stock rebalancing problem
This paper addresses the Rolling Stock Rebalancing Problem (RSRP) which arises within a passenger railway operator when the rolling stock has to be rescheduled due to changing circumstances. RSRP is relevant both in the short-term planning stage and in the real-time operations. RSRP has as input a timetable and a rolling stock circulation where the allocation of the rolling stock among the stat...
متن کاملDevelopment of Model and Algorithm for Depot Balancing Multi-Depot Vehicle Scheduling Problem Considering Depot Balancing
The main of multi-depot vehicle scheduling problem (MDVSP) is to schedule the timetabled trips using limited resources, optimally. The problem is very important in the management of the transportation systems. One of the most useful ways to better manage these systems is to consider the real conditions including depot balancing constraints. To normalize the number of vehicles departed from each...
متن کاملATMOS 2005 Abstracts Collection - Selected Papers from the 5th Workshop on Algorithmic Methods and Models for Optimization of Railways
This issue contains six papers that were presented in preliminary form at the 5th Workshop on Algorithmic Methods and Models for Optimization of Railways (ATMOS 2005), held at Palma de Mallorca, Spain, October 7, 2005 in conjunction with ALGO 2005. These papers are representative of several areas of research within the scope of ATMOS: rolling stock circulation and engine assignment, station loc...
متن کامل