Efficiency of private and public primary health facilities accredited by the National Health Insurance Authority in Ghana.
نویسندگان
چکیده
BACKGROUND Despite improvements in a number of health outcome indicators partly due to the National Health Insurance Scheme (NHIS), Ghana is unlikely to attain all its health-related millennium development goals before the end of 2015. Inefficient use of available limited resources has been cited as a contributory factor for this predicament. This study sought to explore efficiency levels of NHIS-accredited private and public health facilities; ascertain factors that account for differences in efficiency and determine the association between quality care and efficiency levels. METHODS The study is a cross-sectional survey of NHIS-accredited primary health facilities (n = 64) in two regions in southern Ghana. Data Envelopment Analysis was used to estimate technical efficiency of sampled health facilities while Tobit regression was employed to predict factors associated with efficiency levels. Spearman correlation test was performed to determine the association between quality care and efficiency. RESULTS Overall, 20 out of the 64 health facilities (31 %) were optimally efficient relative to their peers. Out of the 20 efficient facilities, 10 (50 %) were Public/government owned facilities; 8 (40 %) were Private-for-profit facilities and 2 (10 %) were Private-not-for-profit/Mission facilities. Mission (Coef. = 52.1; p = 0.000) and Public (Coef. = 42.9; p = 0.002) facilities located in the Western region (predominantly rural) had higher odds of attaining the 100 % technical efficiency benchmark than those located in the Greater Accra region (largely urban). No significant association was found between technical efficiency scores of health facilities and many technical quality care proxies, except in overall quality score per the NHIS accreditation data (Coef. = -0.3158; p < 0.05) and SafeCare Essentials quality score on environmental safety for staff and patients (Coef. = -0.2764; p < 0.05) where the association was negative. CONCLUSIONS The findings suggest some level of wastage of health resources in many healthcare facilities, especially those located in urban areas. The Ministry of Health and relevant stakeholders should undertake more effective need analysis to inform resource allocation, distribution and capacity building to promote efficient utilization of limited resources without compromising quality care standards.
منابع مشابه
Factors That Influence Enrolment and Retention in Ghana’ National Health Insurance Scheme
Background The government of Ghana introduced the National Health Insurance Scheme (NHIS) in 2004 with the goal of achieving universal coverage within 5 years. Evidence, however, shows that expanding NHIS coverage and especially retaining members have remained a challenge. A multilevel perspective was employed as a conceptual framework and methodological tool to examine why enrolment and retent...
متن کاملFrontline staff motivation levels and health care quality in rural and urban primary health facilities: a baseline study in the Greater Accra and Western regions of Ghana
BACKGROUND The population of Ghana is increasingly becoming urbanized with about 70 % of the estimated 26.9 million people living in urban and peri-urban areas. Nonetheless, eight out of the ten regions in Ghana remain predominantly rural where only 32.1 % of the national health sector workforce works. Doctor-patient ratio in a predominantly rural region is about 1:18,257 compared to 1:4,099 in...
متن کاملنظریَه ی مدیریَت نوین دولتی و نقش آن در کارایی ارائه ی خدمات بهداشتی و درمانی در ایران
Introduction: The pattern of health services delivery across the world changes from a spectrum of pure public to pure private sector. The failure of pure private sector, as well as pure public sector, brought experts to recommend alternative approaches such as New Public Management theory as a third-way. This article was aimed to present the results of reform in East Azerbaijan Province on the ...
متن کاملPreferred Primary Healthcare Provider Choice Among Insured Persons in Ashanti Region, Ghana
Background In early 2012, National Health Insurance Scheme (NHIS) members in Ashanti Region were allowed to choose their own primary healthcare providers. This paper investigates the factors that enrolees in the Ashanti Region considered in choosing preferred primary healthcare providers (PPPs) and direction of association of such factors with the choice of PPP. Methods Using a cross-sectiona...
متن کاملStakeholders Perspectives on the Success Drivers in Ghana’s National Health Insurance Scheme – Identifying Policy Translation Issues
Background Ghana’s National Health Insurance Scheme (NHIS), established by an Act of Parliament (Act 650), in 2003 and since replaced by Act 852 of 2012 remains, in African terms, unprecedented in terms of growth and coverage. As a result, the scheme has received praise for its associated legal reforms, clinical audit mechanisms and for serving as a hub for knowledge sharing and learning within...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید
ثبت ناماگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید
ورودعنوان ژورنال:
- Cost effectiveness and resource allocation : C/E
دوره 13 شماره
صفحات -
تاریخ انتشار 2015