The offshore wind farm array cable layout problem: a planar open vehicle routing problem
نویسندگان
چکیده
In an offshore wind farm, the turbines are connected to a transformer by cable routes which cannot cross each other. Finding the minimum cost array cable layout thus amounts to a vehicle routing problem with the additional constraints that the routes must be embedded in the plane. For this problem, both exact and heuristic methods are of interest. We optimize cable layouts for real-world offshore wind farms by a hop-indexed integer programming formulation, and develop a heuristic for computing layouts based on the Clarke and Wright savings heuristic for vehicle routing. Our heuristic computes layouts on average only 2% more expensive than the optimal layout. Finally, we present two problem extensions arising from real-world offshore wind farm cable layouts, and adapt the integer programming formulation to one of them. The thus obtained optimal layouts are up to 13% cheaper than the actually installed layouts.
منابع مشابه
Computing Near-Optimal Array Cable Layouts for Offshore Wind Farms, including Cable Choice
To harvest the generated power, the turbines of an offshore wind farm are connected to an electrical transformer by cable routes. Typical cable layouts use two cable types distinguished by price and capacity: High capacity is expensive. This work presents a heuristic for computing near-optimal layouts based on the Clarke and Wright savings heuristic for vehicle routing, and the layouts it compu...
متن کاملXIII SIMPÓSIO DE ESPECIALISTAS EM PLANEJAMENTO DA OPERAÇÃO E EXPANSÃO ELÉTRICA XIII SYMPOSIUM OF SPECIALISTS IN ELECTRIC OPERATIONAL AND EXPANSION PLANNING Collection System Cable Routing and Wake Losses Optimization in Offshore Wind Farms
Offshore wind farms with high installed capacities and located further from the shore are starting to be built by northern European countries. Furthermore, it is expected that by 2020, several dozens of large offshore wind farms will be built in the Baltic, Irish and North seas. These wind farms will be constituted of a considerable number of turbines packed together. Due to shadowing effects b...
متن کاملAutomated grid connection design process for offshore wind farm clusters
An automated grid connection design process for offshore wind farm clusters that takes into account the variability of wind and power demand/prices is demonstrated on a 7200 MW case study inspired by Dogger Bank, using the Net-Op planning tool. Two modelling approaches for demand, generation and prices are outlined and compared for this case study. Both approaches result in the same optimal off...
متن کاملOffshore Wind Farm Layout Optimization Using Adapted Genetic Algorithm: A different perspective
test In this paper we study the problem of optimal layout of an offshore wind farm to minimize the wake effect impacts. Considering the specific requirements of concerned offshore wind farm, we propose an adaptive genetic algorithm (AGA) which introduces location swaps to replace random crossovers in conventional GAs. That way the total number of turbines in the resulting layout will be effecti...
متن کاملA Combined Metaheuristic Algorithm for the Vehicle Routing Problem and its Open Version
Abstract: The Open Vehicle Routing Problem (OVRP) is one of the most important extensions of the vehicle routing problem (VRP) that has many applications in industrial and service. In the VRP, a set of customers with a specified demand of goods are given and a depot where a fleet of identical capacitated vehicles is located. We are also given the ‘‘traveling costs’’ between the depot and all th...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید
ثبت ناماگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید
ورودعنوان ژورنال:
- JORS
دوره 66 شماره
صفحات -
تاریخ انتشار 2015