Dispatching rules for production scheduling in the capital goods industry
نویسنده
چکیده
Research on dispatching rules has focused upon deterministic job shop situations or small assembly environments and ignored operational factors. This work uses data obtained from a capital goods company that produces complex products. The paper first explores the influence of the data update period and the minimum setup, machining and transfer times under stochastic infinite capacity conditions. It then investigates the significance of these factors and the relative performance of eight dispatching rules with finite capacity and stochastic processing times. Dispatching rules and most operational parameters were statistically significant. With finite capacity, the ‘best’ dispatching rule was different at the component and product levels and varied according to the performance measure used. The shortest operation time first rule generally produced the best results, particularly at product level. r 2006 Elsevier B.V. All rights reserved.
منابع مشابه
New scheduling rules for a dynamic flexible flow line problem with sequence-dependent setup times
In the literature, the application of multi-objective dynamic scheduling problem and simple priority rules are widely studied. Although these rules are not efficient enough due to simplicity and lack of general insight, composite dispatching rules have a very suitable performance because they result from experiments. In this paper, a dynamic flexible flow line problem with sequence-dependent se...
متن کاملEvaluation of Bi-objective Scheduling Problems by FDH, Distance and Triangle Methods
In this paper, two methods named distance and triangle methods are extended to evaluate the quality of approximation of the Pareto set from solving bi-objective problems. In order to use evaluation methods, a bi-objective problem is needed to define. It is considered the problem of scheduling jobs in a hybrid flow shop environment with sequence-dependent setup times and the objectives of minimi...
متن کاملEvaluation of Bi-objective Scheduling Problems by FDH, Distance and Triangle Methods
In this paper, two methods named distance and triangle methods are extended to evaluate the quality of approximation of the Pareto set from solving bi-objective problems. In order to use evaluation methods, a bi-objective problem is needed to define. It is considered the problem of scheduling jobs in a hybrid flow shop environment with sequence-dependent setup times and the objectives of minimi...
متن کاملThe Optimal Decision Combination in Semiconductor Manufacturing
Wafer fabrication is a capital-intensive and highly complex manufacturing process. In a wafer fabrication facility (fab), wafers are grouped as a lot to go through repeated sequences of operations to build circuitry. Lot scheduling is an important task for manufacturers in order to improve production efficiency and satisfy customers’ demands of on-time delivery. Cycle time and average work-in-p...
متن کاملArticleThe optimal decision combination in semiconductor manufacturingSungwook Yoon
Wafer fabrication is a capital-intensive and highly complex manufacturing process. In a wafer fabrication facility (fab), wafers are grouped as a lot to go through repeated sequences of operations to build circuitry. Lot scheduling is an important task for manufacturers in order to improve production efficiency and satisfy customers’ demands of on-time delivery. Cycle time and average work-in-p...
متن کامل