Nuclear Regulatory Commission Notice of Opportunity to Comment on Model Safety Evaluation on Technical Specification Improvement to Relocate Surveillance Frequencies to Licensee Control—risk-informed Technical Specification Task Force (ritstf) Initiative 5b, Technical Specification Task Force—425, Revision 2

نویسنده

  • Michelle Schroll
چکیده

The U. S. Nuclear Regulatory Commission (NRC) has prepared a model license amendment request (LAR), model safety evaluation (SE), and model no significant hazards consideration (NSHC) determination. These are related to changes to standard technical specifications (STS) for Technical Specification Task Force (TSTF)—425, Rev. 2, ‘‘Relocate Surveillance Frequencies to Licensee Control—RITSTF Initiative 5b,’’ (Agencywide Documents Access Management System (ADAMS) Accession No. ML080280275). The purpose of these models is to permit the NRC to efficiently process amendments that propose to relocate TS surveillance frequencies. Licensees of nuclear power reactors could then request amendments, confirming the applicability of the safety evaluation and NSHC determination to their reactors. The NRC staff is requesting comment on the model safety evaluation and model NSHC determination prior to announcing their availability for referencing in license amendment applications.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

NUREG-1521, "Technical Review of Risk-Informed, Performance-Based Methods for Nuclear Power Plant Fire Protection Analyses," Draft Report for Comment

The Nuclear Regulatory Commission (NRC) has instituted an initiative for regulatory improvement to focus licensee and NRC resources on risksignificant activities, and to decrease the prescriptiveness of its regulations through performance-based methods that allow licensees increased flexibility in implementing NRC regulations. The NRC has identified risk-informed methods utilizing insights from...

متن کامل

Nuclear Regulatory Commission Notice of Availability of Model Application concerning Technical Specification Improvement to Revise Control Rod Notch Surveillance Frequency, Clarify Srm Insert Control Rod Action, and Clarify Frequency Example Background

need to prepare an environmental impact statement. Document Access and Management System (ADAMS), which provides text and image files of NRC's public documents. The ADAMS accession numbers for the documents related to this notice are as follows: Document ADAMS accession No. If you do not have access to ADAMS or if there are problems in accessing the documents located in ADAMS, contact the NRC's...

متن کامل

Nuclear Regulatory Commission Technical Specification Improvement for Combustion Engineering Plants to Risk-inform Requirements regarding Conditions Leading to Exigent Plant Shutdown Using the Consolidated Line Item Improvement Process Background

nuclear materials. The Committee will undertake studies and activities related to nuclear materials and waste management such as transportation, waste determinations, reprocessing, storage and disposal facilities, in situ leaching mining, mill tailings, enrichment facilities, health effects, decommissioning, materials safety, application of risk-informed, performance-based regulations, and eval...

متن کامل

WHO Working Group on Technical Specifications for Manufacture and Evaluation of Yellow Fever Vaccines, Geneva, Switzerland, 13-14 May 2009.

In May 2009, WHO convened a meeting of Working Group on Technical Specifications for Manufacturing and Evaluating Yellow Fever (YF) Vaccines, Geneva, Switzerland to initiate revision of the WHO Recommendations (formerly, Requirements) for YF vaccine published in WHO Technical Report Series number 872 (1998). The Working Group, consisting of experts from academia, industry, national regulatory a...

متن کامل

SAFETY DEMONSTRATION OF GEH ADVANCED NUCLEAR POWER PLANT DESIGNS A summary of risk results and benefits of risk-informed regulatory initiatives

Probabilistic Safety Assessments (PSAs) have been performed during the design process for GE Hitachi Nuclear Energy (GEH) advanced nuclear power plant designs, including the ABWR and ESBWR advanced LWRs and the advanced sodium-cooled PRISM fast reactor. As part of the process for each plant, PSA results and risk insights have been developed and provisions were included to ensure that PSA modeli...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2008