Strategic Planning towards Effective Management of New Technology in Open Cast Mines

نویسندگان

  • Anand Pd. Sinha
  • Supriyo Roy
چکیده

Strategic Planning towards Effective Management of New Technology in Open Cast Mines Anand Pd. Sinha, Supriyo Roy Department of Management, Birla Institute of Technology Mesra, Ranchi, Jharkhand, India ______________________________________________________________________________________ Abstract: Technology has become backbone of corporate sustainability after the pro-market reforms due to immense competition worldwide in prime sectors. Technology Management is a practice that entails classification, selection, adoption and exploitation of the technologies needed to maintain organization ’ s current and future survival. Manufacturing sector though invested lot in technological part; is still lacking as per their expectation in terms of overall performance. Coal mining sector in India is one of the core sectors which are far behind comparing with global standards inspite of implementation and use of best technologies. Open cast coal mining industries warrants for state of the art technology which have two aspects: first is the selection of appropriate / suitable technology and second is the effective management of them. Present article highlights strategies and methods adopted in a coal mining industry for effective management of new technology and its implementation. It attempts to focus on effective management of new technology by identifying various factors required for the same in opencast coal mining industries. This research also directs to understand and assess the reasons for low productivity and suggest suitable remedial measures towards effective management during implementation of new technology.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Towards Multifunctionality of Mining Landscapes in the Estonian Oil Shale Basin: Typologies, Assessment and Planning

The paper introduces the landscape assessment approach for the post-mining landscapes in the Estonian oil shale open-cast mines. Typologies of mining landscapes are based on landscape pattern, features and functions predetermined by mining technologies. The open-cast mines which have been predominantly subjected to monofunctional reforestation should direct to diversification of landscape and i...

متن کامل

Commodity price uncertainty propagation in open-pit mine production planning by Latin hypercube sampling method

Production planning of an open-pit mine is a procedure during which the rock blocks are assigned to different production periods in a way that leads to the highest net present value (NPV) subject to some operational and technical constraints. This process becomes much more complicated by incorporation of the uncertainty existing in the input parameters. The commodity price uncertainty is among ...

متن کامل

An imperialist competitive algorithm for solving the production scheduling problem in open pit mine

Production scheduling (planning) of an open-pit mine is the procedure during which the rock blocks are assigned to different production periods in a way that the highest net present value of the project achieved subject to operational constraints. The paper introduces a new and computationally less expensive meta-heuristic technique known as imperialist competitive algorithm (ICA) for long-term...

متن کامل

A new developed model to determine waste dump site selection in open pit mines: An approach to minimize haul road construction cost

Today, during the life of an open pit mine, million tons of materials, including waste and ore, are displacing by truck fleets. In the case of a shallow ore deposit, which is located up to 300 meters to the ground surface, depending on preliminary equipment size and capacity, it will take three to five years to remove overburden and waste rocks to expose the ore body. In that period, the main w...

متن کامل

A Chance Constrained Integer Programming Model for Open Pit Long-Term Production Planning

The mine production planning defines a sequence of block extraction to obtain the highest NPV under a number of constraints. Mathematical programming has become a widespread approach to optimize production planning, for open pit mines since the 1960s. However, the previous and existing models are found to be limited in their ability to explicitly incorporate the ore grade uncertainty into the p...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2015