Experiences with the Design and Production of an Industrial, Flexible and Demountable (IFD) Building System

نویسنده

  • Frans van Gassel
چکیده

The Dutch government encourages innovative construction by subsidizing cohesive industrial, flexible and demountable building (IFD) pilot projects. Industrial building concerns the process-related aspects of production, robotization, mechanization, automation, prefabrication, communication, etc. Flexible building involves products that are made in accordance with customer’s wishes and the possibility to make adjustments when the building is in use. Finally, demountable refers to the sustainability of the building. This paper describes the experiences relating to the design and production of a demonstration project (IFD Today) for an apartment building system on the Eindhoven University of Technology campus. A housing corporation had commissioned the design of an industrial, flexible and demountable building system for flats, on an existing foundation, the surface area and floor plan of which had to be adaptable during use. The current flats do not meet present requirements as set by the government and the occupants, and renovation is too expensive. The data was obtained through participation in the design team and close production monitoring. The paper focuses on industrial building. After monitoring the design and production process, the following conclusions can be drawn: • IFD building requires co-operation and a multidisciplinary approach during the design process. Essential issues to be considered during the design process are the tasks, choice of designer, design tools and the expected result. Design meetings must also be organized. • Due to the lack of a suitable model to calculate the production, operating, renovation and demounting costs and the absence of a marketing plan, conventional designing solutions were frequently applied. • The steel structure and floor panels were mounted very quickly. This was in contrast to the outer walls, roof, fittings and finishing elements. • It is advisable to entrust one specific company with the responsibility for a number of production tasks, such as planning, making and checking the drawings, and allocating labor resources with regard to transport and safety.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Structural and Functional Analysis of an Industrial, Flexible, and Demountable Wall Panel System (RESEARCH NOTE)

Building waste is a critical issue in current construction. Innovative design strategies are required to reduce the depletion of valuable materials and resources through providing flexible and versatile structures. This study focuses on the development of an industrial, flexible, and demountable wall panel construction system. The panel system consists of concrete blocks with steel connectors t...

متن کامل

Assessment of industrial and adaptable building components for a residential layout

From environmental point of view, building waste is a critical issue in present construction. In order to reduce the depletion of valuable materials and natural resources, waste management of constructions needs to be considered in the early stages of design. This requires innovative design strategies that take into account the future demolition and provide flexible and versatile structures. In...

متن کامل

A hybrid algorithm optimization approach for machine loading problem in flexible manufacturing system

The production planning problem of flexible manufacturing system (FMS) concerns with decisions that have to be made before an FMS begins to produce parts according to a given production plan during an upcoming planning horizon. The main aspect of production planning deals with machine loading problem in which selection of a subset of jobs to be manufactured and assignment of their operations to...

متن کامل

Mathematical Modeling for a Flexible Manufacturing Scheduling Problem in an Intelligent Transportation System

This paper presents a new mathematical model for a production system through a scheduling problem considering a material handling system as an intelligent transportation system by automated guided vehicles (AGVs). The traditional systems cannot respond to the changes and customer’s demands and for this reason, a flexible production system is used. Therefore, for this purpose, automated transpor...

متن کامل

A Scheduling Model of Flexible Manufacturing System to Reduce Waste and Earliness/Tardiness Penalties

Nowadays, flexible manufacturing system (FMS) is introduced as a response to the competitive environment. Scheduling of FMS is more complex and more difficult than the other scheduling production systems. One of the main factors in scheduling of FMS is variable time of taking orders from customers, which leads to a sudden change in the manufacturing process. Also, some problems are created in p...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2003