A Price-Directed Heuristic for the Economic Lot Scheduling Problem

نویسندگان

  • Daniel Adelman
  • Christiane Barz
چکیده

We formulate the well-known economic lot scheduling problem (ELSP) with sequence dependent setup times and costs as a semi-Markov decision process. Using an affine approximation of the bias function, we obtain a semi-infinite linear program determining a lower bound for the minimum average total cost rate. The solution of this problem is directly used in a price-directed dynamic heuristic to determine a good cyclic schedule. As the state space of the ELSP is non-trivial for the multi-product setting with setup times, we further illustrate how a lookahead version of the price-directed dynamic heuristic can be used to construct and dynamically improve an approximation of the state space. Numerical results show that the resulting heuristic performs competitively.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

The Economic Lot Scheduling Problem in Flow Lines with Sequence-Dependent Setups

  The problem of lot sizing, sequencing and scheduling multiple products in flow line production systems has been studied by several authors. Almost all of the researches in this area assumed that setup times and costs are sequence –independent even though sequence dependent setups are common in practice. In this paper we present a new mixed integer non linear program (MINLP) and a heuristic me...

متن کامل

Finite Horizon Economic Lot and Delivery Scheduling Problem: Flexible Flow Lines with Unrelated Parallel Machines and Sequence Dependent Setups

This paper considers the economic lot and delivery scheduling problem in a two-echelon supply chains, where a single supplier produces multiple components on a flexible flow line (FFL) and delivers them directly to an assembly facility (AF). The objective is to determine a cyclic schedule that minimizes the sum of transportation, setup and inventory holding costs per unit time without shortage....

متن کامل

The Problem of Scheduling Several Products on A Single Facility with the Simulated Annealing Technique

This paper considers the Economic Lot Scheduling Problem, that is, the problem of scheduling several products on a single facility so as to minimize holding and setup costs. Combination of frequency and timing as well as production quantity make this problem Np-hard. A heuristic is developed to obtain a good solution to ELSP. The proposed heuristic makes use of the Simulated Annealing Technique...

متن کامل

The Problem of Scheduling Several Products on A Single Facility with the Simulated Annealing Technique

This paper considers the Economic Lot Scheduling Problem, that is, the problem of scheduling several products on a single facility so as to minimize holding and setup costs. Combination of frequency and timing as well as production quantity make this problem Np-hard. A heuristic is developed to obtain a good solution to ELSP. The proposed heuristic makes use of the Simulated Annealing Technique...

متن کامل

A New model for integrated lot sizing and scheduling in flexible job shop problem

In this paper an integrated lot-sizing and scheduling problem in a flexible job shop environment with machine-capacity-constraint is studied. The main objective is to minimize the total cost which includes the inventory costs, production costs and the costs of machine’s idle times. First, a new mixed integer programming model,with small bucket time approach,based onProportional Lot sizing and S...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2013