Value of Project Management –a Case Study

نویسنده

  • PASI OJALA
چکیده

The amount of software has increased in several products. Software projects have become more complex and their management requires significant amount of skills from every project manager. The amount of available resources, strict budgets, cost control and need for accurate reporting and documentation as well as good quality are part of every project managers’ life. As business challenges project managers more and more it would be useful to know what areas of project management create biggest value to the projects. Value Engineering has been a usable method for developing high value products for several years. It has been applied successfully to software processes as well as to software product development. This research analyses the value of project management using Value Engineering based value assessment. This is done in part by defining the concepts of value, worth, cost and in part by outlining the Value Engineering process with project management practices. The practical industrial case shows that there is big variety in value between typical project management tasks. It also shows that value of project management tasks can be improved using value Engineering based value assessment. Key-Words: project management, software engineering, value engineering, worth, cost, value.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Estimation of Project Performance Using Earned Value Management and Fuzzy Regression

Earned Value Management is a critical project managementmethodology that evaluates project performance from cost andschedule viewpoints. The novel theoretical framework presented in thispaper estimates future performance of project regarding the past relativeinformation. It benefits from fuzzy regression (FR) models in estimationprocess in order to deal with the vagueness and impreciseness ofre...

متن کامل

Project scheduling optimization for contractor’s Net present value maximization using meta-heuristic algorithms: A case study

Today's competitive conditions have caused the projects to be carried out in the least possible time with limited resources. Therefore, managing and scheduling a project is a necessity for the project. The timing of a project is to specify a sequence of times for a series of related activities. According to their priority and their latency, so that between the time the project is completed and ...

متن کامل

Methodology based on MCDM for risk management in EPC projects: A Case Study of LPG Storage Tanks Construction

The most important aim of every project is on time completion, budget consideration and reaching the highest possible quality, based on contract. This paper suggests a methodology for risk management in engineering, procurement, and construction (EPC) projects. Risk management enables project teams to perform with minimum deviation from predetermined goals. The proposed methodology identifies a...

متن کامل

Estimating the Cost of Water and the Economic Value of Water in the Farmlands Covered by Man-Made Ponds: A Case Study of the Alborz Project Area in Iran

Water pricing is considered as one of the most important management tools of water resources, which can result in optimized allocation in the agricultural sector. In this regard, this study estimated the cost of water and the value of water in the farmlands covered by the selected manmade ponds (MMPs) within the Alborz project area in Mazandaran Province using the engineering economics methods ...

متن کامل

Cutoff grades optimization with environmental management A case study: Sungun Copper Project

Cutoff grade is a grade used to assign a destination label to a parcel of material. The optimal cutoff grades depend on all the salient technological features of mining, such as the capacity of extraction and of milling, the geometry and geology of the orebody, and the optimal grade of concentrate to send to the smelter. The main objective of each optimization of mining operation is to maximize...

متن کامل

The role of Real option in e-business Risk management: The case of E-treasury project

Implementing information technology projects requires a calculated process to prevent failure. At the same time application of information technology in organizations faces various potential risks. Exploring information technology environment in organizations reveals the potential risks and provides a structure for comprehensive risk management. There are various methods available for risk mana...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2009