On Minimizing Total Tardiness in a Serial Batching Problem

نویسندگان

  • Philippe Baptiste
  • Antoine Jouglet
چکیده

We study the problem of scheduling jobs on a serial batching machine to minimize total tardiness. Jobs of the same batch start and are completed simultaneously and the length of a batch equals the sum of the processing times of its jobs. When a new batch starts, a constant setup time s occurs. This problem 1|s-batch| P Ti is known to be NP-Hard in the ordinary sense. In this paper we show that it is solvable in pseudopolynomial time by dynamic programming.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Appling Metaheuristic Algorithms on a Two Stage Hybrid Flowshop Scheduling Problem with Serial Batching (RESEARCH NOTE)

In this paper the problem of serial batch scheduling in a two-stage hybrid flow shop environment with minimizing Makesapn is investigated. In serial batching it is assumed that jobs in a batch are processed serially, and their completion time is defined to be equal to the finishing time of the last job in the batch. The analysis and implementation of the prohibited transference of jobs among th...

متن کامل

A Two-Stage Hybrid Flowshop Scheduling Problem with Serial Batching

In this paper the problem of serial batch scheduling in a two-stage hybrid flow shop environment with minimizing Makesapn is studied. In serial batching it is assumed that jobs in a batch are processed serially, and their completion time is defined to be equal to the finishing time of the last job in the batch. The analysis and implementation of the prohibited transference of jobs among the mac...

متن کامل

Minimizing Total Weighted Tardiness with Drop Dead Dates in Single Machine Scheduling Problem

  This paper deals with minimization of tardiness in single machine scheduling problem when each job has two different due-dates i.e. ordinary due-date and drop dead date. The drop dead date is the date in which jobs’ weights rise sharply or the customer cancels the order. A linear programming formulation is developed for the problem and since the problem is known to be NP-hard, three heuristic...

متن کامل

Minimizing the total tardiness and makespan in an open shop scheduling problem with sequence-dependent setup times

We consider an open shop scheduling problem with setup and processing times separately such that not only the setup times are dependent on the machines, but also they are dependent on the sequence of jobs that should be processed on a machine. A novel bi-objective mathematical programming is designed in order to minimize the total tardiness and the makespan. Among several mult...

متن کامل

Order Batching in Warehouses by Minimizing Total Tardiness: A Hybrid Approach of Weighted Association Rule Mining and Genetic Algorithms

One of the cost-intensive issues in managing warehouses is the order picking problem which deals with the retrieval of items from their storage locations in order to meet customer requests. Many solution approaches have been proposed in order to minimize traveling distance in the process of order picking. However, in practice, customer orders have to be completed by certain due dates in order t...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:
  • RAIRO - Operations Research

دوره 35  شماره 

صفحات  -

تاریخ انتشار 2001