Additional le 2: Model parameters and their justication

نویسنده

  • T. Lipniacki
چکیده

Symbol Values Units Description Comments W0 2 10 12 l cell volume Assumed [1] kv = V=U 5 cytoplasmic to nuclear volume Assumed kb 4 10 6 s 1ml=ng receptor activation rate Assumed kf 6 10 4 s 1 receptor inactivation rate Fitted [3] q1 1:5 10 7 s 1 NFB driven activation of I B and A20 genes Fitted q2 10 6 s 1 I B mediated NFB dissociation from I B and A20 sites Assumed KN 104 total number of IKKK molecules Assumed KNN 2 105 total number of IKK molecules Assumed M 103 total number of receptors Assumed NFBtot 105 total number of NFB molecules Assumed [1] ka 10 4 s 1 IKKK activation rate Assumed ki 0:01 s 1 IKKK inactivation rate Assumed c1 0:1 s 1 inducible A20 and I B mRNA synthesis Assumed c3 0:00075 s 1 A20 and I B mRNA degradation Fitted [2] c4 0:5 s 1 A20 and I B translation rate Fitted c5 0:0005 s 1 A20 degradation rate Fitted ka20 104 A20 TNFR1 block Fitted k2 104 IKKa inactivation due to A20 Fitted k1 5 10 6 s 1 IKKn activation rate Fitted k3 0:003 s 1 IKKa inactivation rate Fitted k4 0:0005 s 1 IKKii transformation Fitted a1 5 10 7 s 1 I B –NF B association Assumed [4] a2 10 7 s 1 IKKa mediated I B phosphorylation Fitted a3 5 10 7 s 1 IKKa mediated ( NF BjI B ) phosphorylation Fitted tp 0:01 s 1 degradation of P-I B and P-I B bounded to NFB Fitted c5a 0:0001 s 1 degradation of I B Assumed [5] c6a 0:00002 s 1 spontaneous degradation of I B bounded to NFB Assumed [5] i1 0:01 s 1 NFB nuclear import Fitted e2a 0:05 s 1 I B jNFB nuclear export Fitted i1a 0:002 s 1 I B nuclear import Fitted e1a 0:005 s 1 I B nuclear export Fitted

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Considering the Epistemic Uncertainties of the Variogram Model in Locating Additional Exploratory Drillholes

To enhance the certainty of the grade block model, it is necessary to increase the number of exploratory drillholes and collect more data from the deposit. The inputs of the process of locating these additional drillholes include the variogram model parameters, locations of the samples taken from the initial drillholes, and the geological block model. The uncertainties of these inputs will lead...

متن کامل

The effect of aquaculture effluents on water quality parameters of Haraz River

In this study, a water quality model of Haraz basin was used as an evaluative tool to estimate the spatial distribution of variables that are related to water quality and nutrient loads of the Haraz River. Previous studies performed in this river indicate that trout culture activity along the Haraz River have led to various changes in the water quality parameters. In the present work, the possi...

متن کامل

The effect of aquaculture effluents on water quality parameters of Haraz River

In this study, a water quality model of Haraz basin was used as an evaluative tool to estimate the spatial distribution of variables that are related to water quality and nutrient loads of the Haraz River. Previous studies performed in this river indicate that trout culture activity along the Haraz River have led to various changes in the water quality parameters. In the present work, the possi...

متن کامل

A Novel Qualitative State Observer

The state estimation of a quantized system (Q.S.) is a challenging problem for designing feedback control and model-based fault diagnosis algorithms. The core of a Q.S. is a continuous variable system whose inputs and outputs are represented by their corresponding quantized values. This paper concerns with state estimation of a Q.S. by a qualitative observer. The presented observer in this pape...

متن کامل

ensitivity, uncertainty and time dependence of arameters in a complex land surface model

This paper explores the use of Monte Carlo carbon cycle data assimilation within the generalized likelihood uncertainty estimation (GLUE) frameworktoevaluate thesensitivitiesofa wellknown complex land surface model (SiB v2.5) to its parameterization and the predictive uncertainty of simulated fluxes on a monthly basis, and for an entire year, at the WLEF talltower site in Park Falls, Wisconsin....

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2007