Wabash River Coal Gasification Repowering Project: A DOE Assessment

ثبت نشده
چکیده

Government nor any agency thereof, nor any of their employees, makes any warranty, express or implied, or assumes any legal liability or responsibility for the accuracy, completeness, or usefulness of any information, apparatus, product, or process disclosed, or represents that its use would not infringe privately owned rights. Reference therein to any specific commercial product, process, or service by trade name, trademark, manufacturer, or otherwise does not necessarily constitute or imply its endorsement, recommendation, or favoring by the United States Government or any agency thereof. The views and opinions of authors expressed therein do not necessarily state or reflect those of the United States Government or any agency thereof.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

OPERATING EXPERIENCE AT THE WABASH RIVER COAL GASIFICATION REPOWERING PROJECT 1998 Gasification Technologies Conference

The Wabash River Coal Gasification Repowering Project (WRCGRP), a joint venture between Dynegy Power Corp., and PSI Energy, Inc., began commercial operation in November of 1995. The Project, selected by the United States Department of Energy (DOE) under the Clean Coal Program (Round IV) represents the largest operating coal-gasification combined-cycle plant in the world. This demonstration proj...

متن کامل

Tampa Electric Integrated Gasification Combined - Cycle Project

Executive Summary The Clean Coal Technology (CCT) Demonstration Program is a government and industry co-funded effort to demonstrate a new generation of innovative coal utilization processes in a series of " show-case " facilities built across the country. These projects are carried out on a sufficiently large scale to prove technical feasibility and provide the information required for additio...

متن کامل

Gasification: The Technology of Choice

The Power Systems Development Facility (PSDF) is an engineering scale demonstration of advanced coal-fired power systems and high-temperature, high-pressure gas filtration systems. The PSDF was designed at sufficient scale so that advanced power system components and the Department of Energy’s Clean Coal Roadmap program elements could be tested in an integrated fashion to provide data for comme...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2002