4D Simulation and Construction Planning

ثبت نشده
چکیده

Students will learn how to use a workflow combining models created with the Autodesk® Revit platform with the Autodesk Navisworks® TimeLiner tool to create 4D simulations of planned construction processes. They will explore modeling techniques for creating better and more accurate simulations, as well as the importance of modeling building elements to reflect planned construction techniques. They will also learn to use Revit features, such as project and shared parameters, to add information to building model elements that supports additional uses of the data in the building model—in this case, for materials tracking and management.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

An Interactive Approach to Collaborative 4d Construction Planning

The use of 4D simulations within the construction field is growing, however, its application when carrying out true collaborative planning has not yet been fully realised. It is postulated that 4D models are currently utilised as a planning review tool, rather than integral to the initial construction planning process and do not fully support multidisciplinary collaborative construction plannin...

متن کامل

4D integrated technologies and process simulation of progress of the project management methods

Effective and detailed planning of large-scale, complex construction projects is of great importance to fulfilling project cost and time objectives. At Tsinghua University of China and The Hong Kong Polytechnic University, the four dimensional-computer aided design (4D construction operations simulation methodology have been researched for years respectively, resulting in innovative, in constru...

متن کامل

Trends of 4D CAD applications for construction planning

Since the early 1990s, there has been a growing interest in four-dimensional computer aided design (4D CAD) for construction project planning. Commercial 4D CAD applications are becoming more accessible and the use of this technology allows the construction planner to produce more rigorous schedules. A review of the technical competencies of these packages highlights that most of the commercial...

متن کامل

Integration of four-dimensional computer-aided design modeling and three-dimensional animation of operations simulation for visualizing construction of the main stadium for the Beijing 2008 Olympic games

In this paper, we give a state review of modeling methodologies for four-dimensional computer-aided design (4D CAD) and three-dimensional (3D) animation of operations simulation. We then present our efforts of integrating 4D CAD and 3D animation of operations simulation to facilitate the construction planning of the main stadium for the Beijing 2008 Olympic Games (nicknamed the ‘‘Bird’s Nest’’)...

متن کامل

4d Construction Planning

Linear, 2-Dimensional and now 3-Dimensional visualization are the current tools used in the construction planning area. It is time for a new dimension to be added the dimension in which Planning Engineers are more interested. The dimension is TIME, which is now appropriate to add as the 4th dimension in construction planning. Current planning processes in the construction industry are still mai...

متن کامل

A Case Study of Applying Virtual Prototyping in Construction

The use of 3D computer-aided design (CAD) models to support construction project planning has been increasing in the previous year. 3D CAD models reveal more planning ideas by visually showing the construction site environment in different stages of the construction process. Using 3D CAD models together with scheduling software to prepare construction plan can identify errors in process sequenc...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2017