Bamboo Garden Trimming Problem (Perpetual Maintenance of Machines with Different Attendance Urgency Factors)

نویسندگان

  • Leszek Gasieniec
  • Ralf Klasing
  • Christos Levcopoulos
  • Andrzej Lingas
  • Jie Min
  • Tomasz Radzik
چکیده

A garden G is populated by n ≥ 1 bamboos b1, b2, ..., bn with the respective daily growth rates h1 ≥ h2 ≥ · · · ≥ hn. It is assumed that the initial heights of bamboos are zero. The robotic gardener or simply a robot maintaining the bamboo garden is attending bamboos and trimming them to height zero according to some schedule. The Bamboo Garden Trimming Problem, or simply BGT, is to design a perpetual schedule of cuts to maintain the elevation of bamboo garden as low as possible. The bamboo garden is a metaphor for a collection of machines which have to be serviced with different frequencies, by a robot which can service only one machine during a visit. The objective is to design a perpetual schedule of servicing the machines which minimizes the maximum (weighted) waiting time for servicing. We consider two variants of BGT. In discrete BGT the robot is allowed to trim only one bamboo at the end of each day. In continuous BGT the bamboos can be cut at any time, however, the robot needs time to move from one bamboo to the next one and this time is defined by a weighted network of connections. For discrete BGT, we show a simple 4-approximation algorithm and, by exploiting relationship between BGT and the classical Pinwheel scheduling problem, we obtain also a 2-approximation and even a closer approximation for more balanced growth rates. For continuous BGT, we propose approximation algorithms which achieve approximation ratios O(log(h1/hn)) and O(log n).

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

A Reliability based Modelling and Optimization of an Integrated Production and Preventive Maintenance Activities in Flowshop Scheduling Problem

Traditional scheduling problems with the batch processing machines (BPM) assume that machines are continuously available, and no time is needed for their preventive maintenance (PM). In this paper, we study a realistic variant of flowshop scheduling which integrates flow shop batch processing machines (FBPM) and preventive maintenance for minimizing the makespan. In order to tackle the given pr...

متن کامل

Application of TPM indicators for analyzing work time of machines used in the pressure die casting

The article presents the application of total productive maintenance (TPM) to analyze the working time indicators of casting machines with particular emphasis on failures and unplanned downtime to reduce the proportion of emergency operation for preventive maintenance and diagnostics. The article presents that the influence of individual factors of complex machinery maintenance (TPM) is ...

متن کامل

Modelling and solving the job shop scheduling Problem followed by an assembly stage considering maintenance operations and access restrictions to machines

This paper considers job shop scheduling problem followed by an assembly stage and Lot Streaming (LS). It is supposed here that a number of products have been ordered to be produced. Each product is assembled with a set of several parts. The production system includes two stages. The first stage is a job shop to produce parts. Each machine can process only one part at the same time. The second ...

متن کامل

Adaptive policy of buffer allocation and preventive maintenance actions in unreliable production lines

The buffer allocation problem is an NP-hard combinatorial optimization problem, and it is an important design problem in manufacturing systems. The research proposed in this paper concerns a product line consisting of n unreliable machines with n − 1 buffers and a preventive maintenance policy. The focus of the research is to obtain a better trade-off between the buffer level ...

متن کامل

Modeling the Hybrid Flow Shop Scheduling Problem Followed by an Assembly Stage Considering Aging Effects and Preventive Maintenance Activities

Scheduling problem for the hybrid flow shop scheduling problem (HFSP) followed by an assembly stage considering aging effects additional preventive and maintenance activities is studied in this paper. In this production system, a number of products of different kinds are produced. Each product is assembled with a set of several parts. The first stage is a hybrid flow shop to produce parts. All ...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2017