Potential of Best Practice to Reduce Impacts from Oil and Gas Projects in the Amazon

نویسندگان

  • Matt Finer
  • Clinton N. Jenkins
  • Bill Powers
چکیده

The western Amazon continues to be an active and controversial zone of hydrocarbon exploration and production. We argue for the urgent need to implement best practices to reduce the negative environmental and social impacts associated with the sector. Here, we present a three-part study aimed at resolving the major obstacles impeding the advancement of best practice in the region. Our focus is on Loreto, Peru, one of the largest and most dynamic hydrocarbon zones in the Amazon. First, we develop a set of specific best practice guidelines to address the lack of clarity surrounding the issue. These guidelines incorporate both engineering-based criteria and key ecological and social factors. Second, we provide a detailed analysis of existing and planned hydrocarbon activities and infrastructure, overcoming the lack of information that typically hampers large-scale impact analysis. Third, we evaluate the planned activities and infrastructure with respect to the best practice guidelines. We show that Loreto is an extremely active hydrocarbon front, highlighted by a number of recent oil and gas discoveries and a sustained government push for increased exploration. Our analyses reveal that the use of technical best practice could minimize future impacts by greatly reducing the amount of required infrastructure such as drilling platforms and access roads. We also document a critical need to consider more fully the ecological and social factors, as the vast majority of planned infrastructure overlaps sensitive areas such as protected areas, indigenous territories, and key ecosystems and watersheds. Lastly, our cost analysis indicates that following best practice does not impose substantially greater costs than conventional practice, and may in fact reduce overall costs. Barriers to the widespread implementation of best practice in the Amazon clearly exist, but our findings show that there can be great benefits to its implementation.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Legal and Contractual Status of Income Taxation in Upstream Contracts of Oil and Gas Industry with Emphasis on Iranian Petroleum Projects

Fiscal regime of upstream oil and gas contracts is a crucial instrument that impacts sharing of revenue generated from petroleum project between host governments and oil company contractors. This regime consists of a variety of fiscal instruments and mechanisms, some of which have a legal and some others a contractual basis.  The most important legal instrument is project income taxation that i...

متن کامل

Assessing Human Risk Factors in Oil and Gas Projects: Case of Pars Oil and Gas Company

The purpose of this study is to provide a comprehensive framework for analyzing risk factors in oil and gas projects. The proposed approach in this study consists of several parts: In the first part, 19 common potential risks in the projects of the Pars Oil and Gas Company were finalized by using Lavasheh Validation method in six groups; these factors were identified through review of previous ...

متن کامل

Assessing Human Risk Factors in Oil and Gas Projects: Case of Pars Oil and Gas Company

The purpose of this study is to provide a comprehensive framework for analyzing risk factors in oil and gas projects. The proposed approach in this study consists of several parts: In the first part, 19 common potential risks in the projects of the Pars Oil and Gas Company were finalized by using Lavasheh Validation method in six groups; these factors were identified through review of previous ...

متن کامل

Use of Operation Research Planning Models to Determine the Optimum Levels of Crude Oil and Gas Production in Iranian Oil and Gas Projects- Case Study: South Pars Project Phases 17 & 18

Determining the optimal level of oil and gas production from the upstream projects of the country is one of the main challenges in the formulation of Master Development Plans (MDP) for petroleum projects and impacts the return on investment and profitability of contracting parties, especially the contractor. In Iran's oil and gas contracts, since the development of the MDP is the responsibility...

متن کامل

A mathematical model for balancing (cost-time-quality and environmental risks) in oil and gas projects and solving it by multi-objective Bee Colony Algorithm

Today, in large projects such as constructing oil, gas and petrochemical refineries, it is inevitable to use modern management methods and project timing. On the other hand, in classic scheduling case, the focus is on balance between time and cost of carrying out projects, which in such a situation, one of possible solutions to shorten time of implementing project is to accelerate activities. T...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:

دوره 8  شماره 

صفحات  -

تاریخ انتشار 2013