Remote Monitoring System for Current Transformers and Beam Position Monitors of Pefp*

نویسندگان

  • In-Seok Hong
  • Yong-Sub Cho
  • Han-Sung Kim
  • Hyeok-Jung Kwon
  • Young-Gi Song
  • Jin Won Lee
چکیده

PEFP(Proton Engineering Frontier Project) in Korean proton linear accelerator program has a diagnostic system with current transformers and beam position monitors. Prototype of current transformer (CT) and beam position monitor(BPPM) were made and tested successfully in tools of the beam diagnostic systems. We are preparing to monitor remotely signals from the diagnostic system. Remote monitoring system is based on VME system with EPICS environments. For fast digitizing the analog signals VME ADC Input Output Board (3301) are used to meet the various needs of beam diagnosis device. EPICS channel access and drivers have been programmed in VME CPU to operate the Input output controller(IOC) and interface operators.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

RHIC Instrumentation

The Relativistic Heavy Ion Collider (RHIC) consists of two 3.8 km circumference rings utilizing 396 superconducting dipoles and 492 superconducting quadrupoles. Each ring will accelerate approximately 60 bunches of 10 protons to 250 GeV, or 10 fully stripped gold ions to 100 GeV/nucleon. Commissioning is scheduled for early 1999 with detectors for some of the 6 intersection regions scheduled fo...

متن کامل

Preparing Accelerator Systems for the RHIC Sextant Commissioning

The Relativistic Heavy Ion Collider (RHIC) construction is progressing steadily towards completion in 1999 when beams will circulate in both collider rings. One of the major tests of the RHIC project was the commissioning of the first sextant with gold ion beams in early 1997. This is a report on preparation of the RHIC accelerator systems for the first sextant test. It includes beam position m...

متن کامل

The Sns Beam Diagnostics Experience and Lessons Learned

The Spallation Neutron Source accelerator systems are designed to deliver a 1.0 GeV, 1.4 MW proton beam to a liquid mercury target for neutron scattering research. The accelerator complex consists of an Hinjector, capable of producing one-ms-long pulses at 60 Hz repetition rate with 38 mA peak current; a 1 GeV linear accelerator; an accumulator ring; and associated transport lines. The accelera...

متن کامل

Beam Current Monitors at the UNILAC

One of the most basic linac operation tools is a beam current transformer. Using outstanding materials, the latest low-noise amplifiers, and some good ideas, a universal current monitoring system has been developed and installed at the UNILAC at GSI. With a dynamic range of 112 dB, covering the low-current range down to 100 nA peak to peak at S/N=1, as well as 25 mA pulses, provided for high-cu...

متن کامل

POSITION AND 1NTENSlT.Y MONITORING SYSTEM FOR THE SPEAR TRANSPORT SYSTEM AT SLAC*

A brief description of the stripline position and intensity monitor for the SPEAR transport system is presented. The basic objective of this system is to visually display on an oscilloscope the current and position information of a 7 ns positron/electron beam of very low duty cycle (lo-20 PPS). The system incorporates and uses much of the video system at the Main Control Center (MCC) which was ...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2007