Strengthening Health Systems at Facility-Level: Feasibility of Integrating Antiretroviral Therapy into Primary Health Care Services in Lusaka, Zambia
نویسندگان
چکیده
INTRODUCTION HIV care and treatment services are primarily delivered in vertical antiretroviral (ART) clinics in sub-Saharan Africa but there have been concerns over the impact on existing primary health care services. This paper presents results from a feasibility study of a fully integrated model of HIV and non-HIV outpatient services in two urban Lusaka clinics. METHODS INTEGRATION INVOLVED THREE KEY MODIFICATIONS: i) amalgamation of space and patient flow; ii) standardization of medical records and iii) introduction of routine provider initiated testing and counseling (PITC). Assessment of feasibility included monitoring rates of HIV case-finding and referral to care, measuring median waiting and consultation times and assessing adherence to clinical care protocols for HIV and non-HIV outpatients. Qualitative data on patient/provider perceptions was also collected. FINDINGS Provider and patient interviews at both sites indicated broad acceptability of the model and highlighted a perceived reduction in stigma associated with integrated HIV services. Over six months in Clinic 1, PITC was provided to 2760 patients; 1485 (53%) accepted testing, 192 (13%) were HIV positive and 80 (42%) enrolled. Median OPD patient-provider contact time increased 55% (6.9 vs. 10.7 minutes; p<0.001) and decreased 1% for ART patients (27.9 vs. 27.7 minutes; p = 0.94). Median waiting times increased by 36 (p<0.001) and 23 minutes (p<0.001) for ART and OPD patients respectively. In Clinic 2, PITC was offered to 1510 patients, with 882 (58%) accepting testing, 208 (24%) HIV positive and 121 (58%) enrolled. Median OPD patient-provider contact time increased 110% (6.1 vs. 12.8 minutes; p<0.001) and decreased for ART patients by 23% (23 vs. 17.7 minutes; p<0.001). Median waiting times increased by 47 (p<0.001) and 34 minutes (p<0.001) for ART and OPD patients, respectively. CONCLUSIONS Integrating vertical ART and OPD services is feasible in the low-resource and high HIV-prevalence setting of Lusaka, Zambia. Integration enabled shared use of space and staffing that resulted in increased HIV case finding, a reduction in stigma associated with vertical ART services but resulted in an overall increase in patient waiting times. Further research is urgently required to assess long-term clinical outcomes and cost effectiveness in order to evaluate scalability and generalizability.
منابع مشابه
Integrating mental health into primary health care in Zambia: a care provider's perspective
BACKGROUND Despite the 1991 reforms of the health system in Zambia, mental health is still given low priority. This is evident from the fragmented manner in which mental health services are provided in the country and the limited budget allocations, with mental health services receiving 0.4% of the total health budget. Most of the mental health services provided are curative in nature and based...
متن کاملDeterminants of Healthcare Utilisation and Out-of-Pocket Payments in the Context of Free Public Primary Healthcare in Zambia
Background Access to appropriate and affordable healthcare is needed to achieve better health outcomes in Africa. However, access to healthcare remains low, especially among the poor. In Zambia, poor access exists despite the policy by the government to remove user fees in all primary healthcare facilities in the public sector. The paper has two main objectives: (i) to examine the factors assoc...
متن کاملThe Need for Global Application of the Accountability for Reasonableness Approach to Support Sustainable Outcomes; Comment on “Expanded HTA: Enhancing Fairness and Legitimacy”
The accountability for reasonableness (AFR) concept has been developed and discussed for over two decades. Its interpretation has been studied in several ways partly guided by the specific settings and the researchers involved. This has again influenced the development of the concept, but not led to universal application. The potential use in health technology assessments (HTAs) has recently be...
متن کاملUnit Costing of Health Extension Worker Activities in Ethiopia: A Model for Managers at the District and Health Facility Level
Background Over the last decade, Ethiopia has made impressive national improvements in health outcomes, including reductions in maternal, neonatal, infant, and child mortality attributed in large part to their Health Extension Program (HEP). As this program continues to evolve and improve, understanding the unit cost of health extension worker (HEW) services is fundamental to planning for futur...
متن کاملStrengthening Care Delivery in Primary Care Facilities: Perspectives of Facility Managers on the Immunization Program in Kenya
Background Primary healthcare facility managers (PHFMs) occupy a unique position in the primary healthcare system, as the only cadre combining frontline clinical activities with managerial responsibilities. Often serving as ‘street-level bureaucrats,’ their perspectives can provide contextually relevant information about interventions for strengthening primary healthcare delivery, yet suc...
متن کامل