USING 4 D MODELING TO ADVANCE CONSTRUCTION VISUALIZATION IN ENGINEERING EDUCATION by Lingyun Wang Technical Report

نویسنده

  • Lingyun Wang
چکیده

Students in construction and engineering disciplines typically learn how to develop a building construction schedule by visualizing 2D design documents for a building project. This learning process is difficult since a student first needs to associate components in the 2D documents with their related construction activities, and then mentally visualize the construction sequence. 4D modeling technologies, visually representing the construction schedule time along with the 3D model components, has the potential to aid this learning process by providing a common visual language for students. This research examines the value of implementing 4D modeling technologies in construction engineering education for learning how to develop building construction schedules, and the associated concepts regarding sequencing and resource utilization. This research also targeted the development of a new process for creating a 4D model which is implemented in the Virtual Construction Simulator (VCS) application. This approach allows a student to generate a construction schedule directly from a 3D model without first creating a critical path method (CPM) schedule, which is required by current commercial 4D modeling applications. To assess the effectiveness of using 4D modeling to visualize a construction schedule, a case study research project was performed where small student groups developed a construction schedule with the aid of a 4D learning module. The 4D learning modules were developed using two different 4D modeling applications (a commercial 4D modeling application and the VCS). An experiment was conducted to assess, compare and determine the pedagogical value of the two applications. The 4D learning modules were found to be beneficial based on quality of the resulting solutions presentation effectiveness, and the perception of the students. The VCS application was more valuable than the commercial 4D application since it encouraged more collaborative group work, engaged students, and provided a greater focus on solution development.

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

The Convergence of Architectural and Engineering Design and GIS: Implications for Emergency Response and Urban Planning

Convergence is occurring in the fields of architectural and engineering design, construction, and GIS. The primary goal is to ensure that everyone working on a building, road or highway, and infrastructure project has a seamless flow of design information. The primary business drivers for this transformative technology advance are productivity and efficiency in the design, construction and faci...

متن کامل

Numerical Analysis of Stress Distribution During Tunneling in Clay Stone Rock

Modern technology has been used to build tunnels in recent years by means of drilling machines (TBM) that were used for civil engineering work in large cities to reduce the harmful effects of spending on the surface of the earth significantly. To build the tunnel, numerical modeling was used on the basis of the finite element method to predict stress behavior during the tunnel construction proc...

متن کامل

Effective energy consumption parameters in residential buildings using Building Information Modeling

Building information modeling can help in predicting the energy efficiency in future based on dynamic patterns obtained by visualization of data. The aim of this study was to investigate the effective parameters of energy consumption using BIM technology which can evaluate the buildings energy performance. First, three forms of general states in the building were modeled to evaluate the propose...

متن کامل

Data Envelopment Analysis with LINGO Modeling for Technical Educational Group of an Organization

Data Envelopment Analysis (DEA) was developed to help compare the relative performance of decision-making units. It is a non-parametric method for performing frontier analysis. It uses linear programming to estimate the efficiency of multiple decision-making units and it is commonly used in production, management and economics [3]. DEA generates an efficiency score between 0 and 1 for each unit...

متن کامل

3 . Teaching of High - Rise Structure Principles through 4 D Simulation

4D modeling and visualization is more and more used in construction education curricula. The main interest of this technology is its ability to simulate real sequencing of construction tasks in order to confront the student with real-life construction management issues. This article presents a course for architecture and construction engineers about the teaching of structural principles of high...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2007