Performance Evaluation of CHART - An Incident Management Program - in 1997

ثبت نشده
چکیده

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

An ex ante control chart for project monitoring using earned duration management observations

In the past few years, there has been an increasing interest in developing project control systems. The primary purpose of such systems is to indicate whether the actual performance is consistent with the baseline and to produce a signal in the case of non-compliance. Recently, researchers have shown an increased interest in monitoring project’s performance indicators, by plotting them on the S...

متن کامل

A graphical instrument for performance analysis of contractors

The relationship between the manufacturer and supplier has changed from one of competition into that of greater cooperation during recent years. The selection and evaluation of suppliers are primary and important issues when an enterprise implements Supplier Relationship Management (SRM) and Total Quality Management (TQM). Much research indicates that most enterprises tend to evaluate their sup...

متن کامل

Potential Benefits and Downsides of External Healthcare Performance Evaluation Systems: Real-Life Perspectives on Iranian Hospital Evaluation and Accreditation Program

Background Performance evaluation is essential to quality improvement in healthcare. The current study has identified the potential pros and cons of external healthcare evaluation programs, utilizing them subsequently to look into the merits of a similar case in a developing country.   Methods A mixed method study employing both qualitative and quantitative data collection and analysis techniqu...

متن کامل

An Evaluation of an Adaptive Generalized Likelihood Ratio Charts for Monitoring the Process Mean

When the objective is quick detection both small and large shifts in the process mean with normal distribution, the generalized likelihood ratio (GLR) control charts have better performance as compared to other control charts. Only the fixed parameters are used in Reynolds and Lou’s presented charts. According to the studies, using variable parameters, detect process shifts faster than fixed pa...

متن کامل

Self-Starting Control Chart and Post Signal Diagnostics for Monitoring Project Earned Value Management Indices

Earned value management (EVM) is a well-known approach in a project control system which uses some indices to track schedule and cost performance of a project. In this paper, a new statistical framework based on self-starting monitoring and change point estimation is proposed to monitor correlated EVM indices which are usually auto-correlated over time and non-normally distributed. Also, a new ...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2000