Planning and exploring under uncertainty

نویسنده

  • Elizabeth M. Murphy
چکیده

Scalable autonomy requires a robot to be able to recognize and contend with the uncertainty in its knowledge of the world stemming from its noisy sensors and actuators. The regions it chooses to explore, and the paths it takes to get there, must take this uncertainty into account. In this thesis we outline probabilistic approaches to represent that world; to construct plans over it; and to determine which part of it to explore next. We present a new technique to create probabilistic cost maps from overhead imagery, taking into account the uncertainty in terrain classification and allowing for spatial variation in terrain cost. A probabilistic cost function combines the output of a multi-class classifier and a spatial probabilistic regressor to produce a probability density function over terrain for each grid cell in the map. The resultant cost map facilitates the discovery of not only the shortest path between points on the map, but also a distribution of likely paths between the points. These cost maps are used in a path planning technique which allows the user to trade-off the risk of returning a suboptimal path for substantial increases in search speed. We precompute a probability distribution which precisely approximates the true distance between any grid cell in the map and goal cell. This distribution underpins a number of A* search heuristics we present, which can characterize and bound the risk we are prepared to take in gaining search efficiency while sacrificing optimal path length. Empirically, we report efficiency increases in excess of 70% over standard heuristic search methods. Finally, we present a global approach to the problem of robotic exploration, utilizing a hybrid of a topological data structure and an underlying metric mapping process. A ‘Gap Navigation Tree’ is used to motivate global target selection and occluded regions of the environment (‘gaps’) are tracked probabilistically using the metric map. In pursuing these gaps we are provided with goals to feed to the path planning process en route to a complete exploration of the environment. The combination of these three techniques represents a framework to facilitate robust exploration in a-priori unknown environments.

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

A practical approach to open-pit mine planning under price uncertainty using information gap decision theory

In the context of open-pit mine planning, uncertainties including commodity price would significantly affect the technical and financial aspects of mining projects. A mine planning that takes place regardless of the uncertainty in price just develops an optimized plan at the starting time of the mining operation. Given the price change over the life of mine, which is quite certain, optimality o...

متن کامل

A Single Machine Capacitated Production Planning Problem Under Uncertainty: A Grey Linear Programming Approach

The production planning is an important problem in most of manufacturing systems in practice. Unlike many researches existing in literature, this problem encounters with great uncertainties in parameters and input data. In this paper, a single machine capacitated production planning problem is considered and a linear programming formulation is presented. The production costs are assumed to be u...

متن کامل

Integrated Inspection Planning and Preventive Maintenance for a Markov Deteriorating System Under Scenario-based Demand Uncertainty

In this paper, a single-product, single-machine system under Markovian deterioration of machine condition and demand uncertainty is studied.  The objective is to find the optimal intervals for inspection and preventive maintenance activities in a condition-based maintenance planning with discrete monitoring framework. At first, a stochastic dynamic programming model whose state variable is the ...

متن کامل

A Stochastic Programming Approach for a Multi-Site Supply Chain Planning in Textile and Apparel Industry under Demand Uncertainty

In this study, a new stochastic model is proposed to deal with a multi-product, multi-period, multi-stage, multi-site production and transportation supply chain planning problem under demand uncertainty. A two-stage stochastic linear programming approach is used to maximize the expected profit. Decisions such as the production amount, the inventory level of finished and semi-finished product, t...

متن کامل

A stochastic model for operating room planning under uncertainty and equipment capacity constraints

In the present economic context, the operating theater is considered as a critical activity in health care management. This paper describes a model for operating room (OR) planning under constraint of a unique equipment. At first level we schedule elective surgeries under the uncertainty of using a unique equipment. At the second level we consider emergency surgeries, and at the third le...

متن کامل

Optimizing decentralized production–distribution planning problem in a multi-period supply chain network under uncertainty

Decentralized supply chain management is found to be significantly relevant in today’s competitive markets. Production and distribution planning is posed as an important optimization problem in supply chain networks. Here, we propose a multi-period decentralized supply chain network model with uncertainty. The imprecision related to uncertain parameters like demand and price of the final produc...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2010