Berth and quay crane scheduling: problems, models and solution methods

نویسنده

  • Aykagan Ak
چکیده

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Simultaneous Optimization of Berth Allocation, Quay Crane Assignment and Quay Crane Scheduling Problems in Container Terminals

In this work, we focus on the integrated planning of the following problems faced within the context of seaside operations at container terminals: berth allocation, quay crane assignment, and quay crane scheduling. First, we formulate a new binary integer linear program for the integrated solution of the berth allocation and quay crane assignment problems called BACAP. Then we extend it by inco...

متن کامل

Addressing a Coordinated Quay Crane Scheduling and Assignment Problem by Red Deer Algorithm

Nowadays, there is much attention for planning of container terminals in the global trade centers. The high cost of quay cranes motivates both scholars and industrial practitioners especially in the last decade to develop novel optimization models to address this dilemma. This study proposes a coordinated optimization model to cover both Quay Crane Scheduling Problem (QCSP) and Quay Crane Assig...

متن کامل

A Mathematical Model and Grouping Imperialist Competitive Algorithm for Integrated Quay Crane and Yard Truck Scheduling Problem with Non-crossing Constraint

In this research, an integrated approach is presented to simultaneously solve quay crane scheduling and yard truck scheduling problems. A mathematical model was proposed considering the main real-world assumptions such as quay crane non-crossing, precedence constraints and variable berthing times for vessels with the aim of minimizing vessels completion time. Based on the numerical results, thi...

متن کامل

The Tactical Berth Allocation Problem with Quay Crane Assignment and Transshipment-related Quadratic Yard Costs

In this paper we integrate two decision problems arising in container terminals: the berth allocation problem, which consists of assigning and scheduling incoming ships to berthing positions, and the quay crane assignment problem, which assigns to incoming ships a certain QC profile (i.e. number of quay cranes per working shift). They are indeed strictly correlated, as the QC profile assigned t...

متن کامل

Optimal berth allocation, time-variant quay crane assignment and scheduling with crane setups in container terminals

We focus on the integrated seaside operations in container terminals, namely the integration of berth allocation, quay crane assignment and quay crane scheduling problems. We first develope a mixed-integer linear programming formulation. Then, we propose an efficient cutting plane algorithm based on a decomposition scheme. Our approach deals with berthing positions of the vessels and their assi...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2008