Theory of Constraints has been emerging as an important tool for optimization of manufacturing/service systems. Goldratt in his first book “ The Goal ” gave the introduction on Theory of Constraints and its applications in a factory scenario. A large number of production managers around the globe read this book but only a few could implement it in their plants because the book did not explain the steps to implement TOC in the factory. To overcome these limitations, Goldratt wrote this book to explain TOC, DBR and the method to implement it. In this paper, an attempt has been made to summarize the salient features of TOC and DBR listed in the book and the correct approach to implement TOC in a factory setting. The simulator available along with the book was actually used by the authors and the claim of Goldratt regarding the use of DBR and Buffer management to ease the work of production managers was tested and was found to be correct. Keywords—Drum Buffer Rope (DBR), Optimized Production Technology (OPT), Capacity Constrained Resource (CCR)
منابع مشابه
Improving for Drum_Buffer_Rope material flow management with attention to second bottlenecks and free goods in a job shop environment
Drum–Buffer–Rope is a theory of constraints production planning methodology that operates by developing a schedule for the system’s first bottleneck. The first bottleneck is the bottleneck with the highest utilization. In the theory of constraints, any job that is not processed at the first bottleneck is referred to as a free good. Free goods do not use capacity at the first bottleneck, so very...
متن کاملProduction Planning and Control in Flow Shop Operations using Drum Buffer Rope Methodology: A System Dynamics Approach
This paper aims to introduce System Dynamics (SD) in applying Drum Buffer Rope (DBR) methodology of Theory of Constraints (TOC) in a three-stage flow shop system that produces a single product. To the best of our knowledge, although there are a lot of TOC applications using discrete simulation in production scheduling with DBR methodology, there are not any TOC application of DBR methodology in...
متن کاملAPPLICATION OF THEORY OF CONSTRAINTS ON SCHEDULING OF DRUM-BUFFER-ROPE SYSTEM S.S.Mahapatra
The successful enterprises deliver products and services in shorter throughput time and turnover inventory as quickly as possible. Three important approaches to achieve these goals are Materials Requirements Planning (MRPI, MRPII), Just-in-Time (JIT), and Theory of Constraints (TOC). TOC seems to be a viable proposition because it does not require costly affair of system change; rather it is si...
متن کاملA Multi-Objective Optimization Approach Using Genetic Algorithms for Quick Response to Effects of Variability in Flow Manufacturing
This paper exemplifies a framework for development of multi-objective genetic algorithm based job sequencing method by taking account of multiple resource constraints. Along this, Theory of Constraints based Drum-Buffer-Rope methodology has been combined with genetic algorithm to exploit the system constraints. This paper introduces the Drum-Buffer-Rope to exploit the system constraints, which ...
متن کاملDynamic Drum-Buffer-Rope approach for production planning and control in capacitated flow-shop manufacturing systems
Drum-Buffer-Rope-based production planning and control (PPC) approaches provide production managers with effective tools to manage production disruptions and improve operational performance. The corner stone of these approaches is the proper selection of time-buffers which are considered as exogenously defined constant. However, the majority of real-world manufacturing systems are characterized...