Scheduling in Bandwidth Constrained Tree Networks [Extended Abstract]
نویسندگان
چکیده
In this paper we introduce a new network scheduling model. Here jobs need to be sent via routers on a tree to machines to be scheduled, and the communication is constrained by network bandwidth. The scheduler coordinates network communication and job machine scheduling. This type of scheduler is highly desirable in practice; yet few works have considered combing networking with job processing. We consider the popular objective of total flow time in the online setting. We give a (1+ )-speed O( 1 7 )-competitive algorithm when all routers are identical and all machines are identical for any fixed > 0. Then we go on to show a (2 + )-speed O( 1 7 )-competitive algorithm when the routers are identical and the machines are unrelated. To show these results we introduce an interesting combination of potential function and dual fitting techniques as well as a reduction of general tree scheduling to a special case of trees.
منابع مشابه
An Exact Algorithm for the Mode Identity Project Scheduling Problem
In this paper we consider the non-preemptive variant of a multi-mode resource constrained project scheduling problem (MRCPSP) with mode identity, in which a set of project activities is partitioned into disjoint subsets while all activities forming one subset have to be processed in the same mode. We present a depth-first branch and bound algorithm for the resource constrained project schedulin...
متن کاملDetailed Scheduling of Tree-like Pipeline Networks with Multiple Refineries
In the oil supply chain, the refined petroleum products are transported by various transportation modes, such as rail, road, vessel and pipeline. The latter provides one of the safest and cheapest ways to connect production areas to local markets. This paper addresses the operational scheduling of a multi-product tree-like pipeline connecting several refineries to multiple distribution centers ...
متن کاملDetecting communities of workforces for the multi-skill resource-constrained project scheduling problem: A dandelion solution approach
This paper proposes a new mixed-integer model for the multi-skill resource-constrained project scheduling problem (MSRCPSP). The interactions between workers are represented as undirected networks. Therefore, for each required skill, an undirected network is formed which shows the relations of human resources. In this paper, community detection in networks is used to find the most compatible wo...
متن کاملAssessment of DSACC and QPART Algorithms in Ad Hoc Networks
The rapid advancement in wireless over wired has augmented the need for improving theQuality of Service (QoS) over such wireless links. However, the wireless ad hoc networkshave too low bandwidth, and establishing a QoS in these networks is a difficult issue. So,support of quality of service in ad hoc networks is the topical issue among the networkscience researchers. In this research we are go...
متن کاملA Genetic Algorithm and a Model for the Resource Constrained Project Scheduling Problem with Multiple Crushable Modes
Abstract: This paper presents an exact model and a genetic algorithm for the multi-mode resource constrained project scheduling problem with generalized precedence relations in which the duration of an activity is determined by the mode selection and the duration reduction (crashing) applied within the selected mode. All resources considered are renewable. The objective is to determine a mode, ...
متن کامل