Project Final Report
ثبت نشده
چکیده
Grant Agreement number: 312631 Project acronym: SPICED Project title: Securing the spices and herbs commodity chains in Europe against deliberate, accidental or natural biological and chemical contamination Funding Scheme: Collaborative Project (CP) – Small or medium-scale focused research project (STREP) Period covered: from M1 (01 July 2013) to M36 (30 June 2016) Name of the project coordinator, Title and Organisation: Dr. Juliane Bräunig, Federal Institute for Risk Assessment (BfR) Tel: +49 3
منابع مشابه
Final Project Report of the DFG-Transferbereich 42:
This final project report summarizes the objectives, realization, and the results of the DFG-Transferbereich 42. The report describes the flames considered, flame simulations, and results of flame simulations. A summary of project publication records, the transfer of project results and planned future activities will be also given.
متن کاملForecasting Final Schedule and Cost of Projects by Using Statistical and Mathematical Method
Earned value management (EVM) has prepared some methods to forecast final costs of projects. These methods were not developed since the start of formation and were gradually completed, of course with one exception that is its authenticity, they are still remained unchanged. At the present time EVM guide does not apply from schedule indices to forecast schedule for completion of project and ...
متن کاملMath 521: Group Final Project Report: Is It a Cat or a Dog?
This report documents the methods we used to process the cat/dog images and build classifiers for the Spring 2012 group final project for Math 521.
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
عنوان ژورنال:
دوره شماره
صفحات -
تاریخ انتشار 2016