Alternative Methods for Testing the Pole-to-ground Insulation of Thyristor Valves in Uhvdc Systems

نویسندگان

  • D. Wu
  • P. Karlsson
چکیده

In the design of DC system, more than one MVU tower may be used between pole-to-neutral voltages. This is especially common for UHVDC systems. The insulation design of these MVU’s need to be verified by dielectric type tests as specified by international standards. However, the application of several MVU’s in series makes the test set-up complicated. One straightforward solution is to install all valve towers under the pole to neutral voltage for the dielectric tests. This multiple-tower solution brings with it the complexities and risks. This test set-up puts also high demands on the space and mechanical strength of the laboratory. From project engineering point of view, to assemble before the dielectric type tests and then to disassemble such a large test object is a labour and time consuming task. An alternative is to install only one valve tower with external voltage sharing components. Reduced complexity and risk are the main advantages to use the one-tower set-up. Such a one-tower set-up is a flexible solution with regard to the voltage at the terminals of valve towers. It has also advantages over multiple-tower set-up, with respect to requirement on laboratory conditions, labour and time consumptions. In this paper, the alternative test set-up’s for the MVU dielectric tests are presented.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

External Insulation Design of Converter Stations for Xiangjiaba - Shanghai ± 800 kV UHVDC Project

-External insulation is one of the critical aspects in the HVDC equipments and converter station design. Especially for UHVDC converter stations, the long creepage and clearance required has significant impact on the equipment and station design. The external insulation design of DC yard, valve hall, and for converter valves is presented. It is the intention of this report to review and summari...

متن کامل

Transient Minimization Within Static Var Compensated Distribution Systems

VAR support should be supplied as close to the load as possible to minimize transmission losses. For voltage control and for improvement of total power factor in a distribution system the circuit- breaker switched capacitor banks can be used. The problems with this solution are the voltage steps caused by the large sizes of the capacitor banks as well as the transients caused on insertion. Thyr...

متن کامل

New Methods for Harmonic Reduction in T. C. R. by Sequence Control of Transformer Taps

Thyristor controlled static compensators consist of two basic schemes, TCR and TSC. Owing to the discontinuous current in TCR, current harmonics are generated in the supply system. This paper introduces two methods for the reduction of these harmonics. On the basis of the coordination or uncoordination of turn ratios with harmonic reduction levels, each method is described in two alternative sc...

متن کامل

Heat Transfer, Environmental Benefits, and Social Cost Analysis of Different Insulation Methods by Considering Insulation Disadvantages

In this paper, the thermal performance of four common insulators in two internal and external insulation systems is investigated for the ASHRAE setpoint range by applying detailed numerical simulation and Anti-Insulation phenomenon. Anti-Insulation phenomenon and consequent extra load on the HVAC system can occur following the thermal insulation of a building if proper temperature setpoint is n...

متن کامل

Optimal DG Allocation and Thyristor-FCL Controlled Impedance Sizing for Smart Distribution Systems Using Genetic Algorithm

Recently, smart grids have been considered as one of the vital elements in upgrading current power systems to a system with more reliability and efficiency. Distributed generation is necessary for most of these new networks. Indeed, in all cases that DGs are used in distribution systems, protection coordination failures may occur in multiple configurations of smart grids using DGs. In different...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2015