The n×m minimum-makespan general job-shop scheduling problem, hereafter referred to as the JSSP, can be described by a set of n jobs {Ji}1≤j≤n which is to be processed on a set of m machines {Mr}1≤r≤m. Each job has a technological sequence of machines to be processed. The processing of job Jj on machine Mr is called the operation Ojr. Operation Ojr requires the exclusive use of Mr for an uninterrupted duration pjr, its processing time. A schedule is a set of completion times for each operation {cjr}1≤j≤n,1≤r≤m that satisfies those constraints. The time required to complete all the jobs is called the makespan L. The objective when solving or optimizing this general problem is to determine the schedule which minimizes L. An example of a 3× 3 JSSP is given in Table 1. The data includes the routing of each job through each machine and the processing time for each operation (in parentheses). Figure 1 shows a solution for the problem represented by “Gantt-Chart”.

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Three Hybrid Metaheuristic Algorithms for Stochastic Flexible Flow Shop Scheduling Problem with Preventive Maintenance and Budget Constraint

Stochastic flexible flow shop scheduling problem (SFFSSP) is one the main focus of researchers due to the complexity arises from inherent uncertainties and also the difficulty of solving such NP-hard problems. Conventionally, in such problems each machine’s job process time may encounter uncertainty due to their relevant random behaviour. In order to examine such problems more realistically, fi...

متن کامل

Hybrid algorithms for Job shop Scheduling Problem with Lot streaming and A Parallel Assembly Stage

In this paper, a Job shop scheduling problem with a parallel assembly stage and Lot Streaming (LS) is considered for the first time in both machining and assembly stages. Lot Streaming technique is a process of splitting jobs into smaller sub-jobs such that successive operations can be overlapped. Hence, to solve job shop scheduling problem with a parallel assembly stage and lot streaming, deci...

متن کامل

Improved teaching–learning-based and JAYA optimization algorithms for solving flexible flow shop scheduling problems

Flexible flow shop (or a hybrid flow shop) scheduling problem is an extension of classical flow shop scheduling problem. In a simple flow shop configuration, a job having ‘g’ operations is performed on ‘g’ operation centres (stages) with each stage having only one machine. If any stage contains more than one machine for providing alternate processing facility, then the problem...

متن کامل

Optimality of the flexible job shop scheduling system based on Gravitational Search Algorithm

The Flexible Job Shop Scheduling Problem (FJSP) is one of the most general and difficult of all traditional scheduling problems. The Flexible Job Shop Problem (FJSP) is an extension of the classical job shop scheduling problem which allows an operation to be processed by any machine from a given set. The problem is to assign each operation to a machine and to order the operations on the machine...

متن کامل

Optimality of the flexible job shop scheduling system based on Gravitational Search Algorithm

The Flexible Job Shop Scheduling Problem (FJSP) is one of the most general and difficult of all traditional scheduling problems. The Flexible Job Shop Problem (FJSP) is an extension of the classical job shop scheduling problem which allows an operation to be processed by any machine from a given set. The problem is to assign each operation to a machine and to order the operations on the machine...

متن کامل

Modelling and solving the job shop scheduling Problem followed by an assembly stage considering maintenance operations and access restrictions to machines

This paper considers job shop scheduling problem followed by an assembly stage and Lot Streaming (LS). It is supposed here that a number of products have been ordered to be produced. Each product is assembled with a set of several parts. The production system includes two stages. The first stage is a job shop to produce parts. Each machine can process only one part at the same time. The second ...