Multiple-source learning precedence graph concept for the automotive industry
نویسندگان
چکیده
In modern production systems, customized mass production of complex products, such as automotive or white goods, is often realized at assembly lines with a high degree of manual labor. For firms that apply assembly systems the assembly line balancing problem (ALBP) arises, which is to assign optimally tasks to stations or workers with respect to some constraints and objectives. Although the literature provides a number of relevant models and efficient solution methods for ALBP, firms, in most cases, do not use this knowledge to balance their lines. Instead, the planning is mostly performed manually by numerous planners responsible for small sub-problems. This is because of the lack of data, like the precedence relations between the tasks to be performed. Such data is hard to collect and to maintain updated. Klindworth et al. (2012) proposed an approach to collect and to maintain the data on precedence relations between tasks at a low cost, as well as to produce new high-quality feasible assembly balances based on this data. They utilize the knowledge on former production plans available in the firm. However, due to reliance on the single source of information, their concept needs long warming-up periods. Therefore, we enhance the concept by incorporating multiple sources of information available at firms, as the modular structure, and present a guideline on how to conduct valuable interviews. As a result, our approach generates more efficient new feasible assembly line balances without requiring such a long warming-up period.
منابع مشابه
On a learning precedence graph concept for the automotive industry
Assembly line balancing problems (ALBP) consist in assigning the total workload for manufacturing a product to stations of an assembly line as typically applied in automotive industry. The distribution of the tasks to the stations is due to restrictions which can be expressed in a precedence graph. However, automotive manufacturers usually do not know complete precedence graphs describing the p...
متن کاملAn improved genetic algorithm for multidimensional optimization of precedence-constrained production planning and scheduling
Integration of production planning and scheduling is a class of problems commonly found in manufacturing industry. This class of problems associated with precedence constraint has been previously modeled and optimized by the authors, in which, it requires a multidimensional optimization at the same time: what to make, how many to make, where to make and the order to make. It is a combinatorial,...
متن کاملInter-Partner Interactions and Knowledge Transfer Mechanisms in the Chinese Automotive Industry: A Qualitative Research Based on Dual Managerial Perceptions
The purpose of this study is to extend the existing knowledge of inter-firm knowledge transfer research and provide a deeper understanding of knowledge transfer practice in an alliance context, as well as the reasons for such a practice. This study reports on relevant results derived from semi-structured interviews with 16 top managers in a Chinese international joint venture (IJV) formed by tw...
متن کاملManaging Automotive Product Development
The new product development (NPD) is the process by which a new product idea is conceived, investigated, taken through the design process, manufactured, marketed and serviced. In Automotive Engineering these related to the product realization process (PRP) which consists of five phases: "Plan and Define Program", "Product Design and Development", "Process Design and...
متن کاملUse of Equity Market Value for explaining Cash Flow Return on Investment (CFROI) and Created Shareholder Value (CSV) Evidence from Automotive Industry Tehran Stock Exchange
The concept of Value Creation is gaining momentum in Iran under the open regime. Iranian Companies are geared to understand and act upon the concept of Shareholder Value to stay competitive in this unfathomable and volatile environment. Most executives today understand that, the need to create shareholder value is paramount and the world’s most competitive management teams are responding to the...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید
ثبت ناماگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید
ورودعنوان ژورنال:
- European Journal of Operational Research
دوره 234 شماره
صفحات -
تاریخ انتشار 2014