On the Impact of Uncertainty on some Optimizaiton Problems: Combinatorial Aspects of Delay Management and Robust Online Scheduling
نویسنده
چکیده
Real-life optimization problems frequently rely on input data which only estimates the data actually appearing when a computed solution is used in practice. Small deviations of the actual data from the input data can have many different consequences: for instance, a computed solution might need to be adapted in order to guarantee feasibility, or the quality of a computed solution might degrade significantly. In some cases, a computed solution can be adapted to incorporate the deviations, thus making the solution feasible again or qualitatively better. In other cases, it might be too late to perform adaptations, and the quality of the solution irredeemably suffers from the deviations. In this thesis, we consider two problems dealing with such perturbations of the input data. The first problem considered is delay management in railway systems, a problem arising when trains run late. Delay management consists in deciding which trains should wait for delayed transferring passengers, with the goal of minimizing the passenger discomfort. If a connecting train waits for delayed passengers, these passengers are able to board the connecting train, but delay propagates to all the passengers using the connecting train. As a consequence, these passengers might also miss a future connection. If the connecting train departs as scheduled, the delayed transferring passengers miss the connection, and have to board the next available connection, which results in a bigger delay for them. Delay management aims at finding a trade-off between delaying passengers which were originally on time, and letting delayed passengers miss their connections. Currently, this aspect of railway operations is usually handled by human dispatchers. This thesis analyzes a theoretical model for delay management. This model is highly simplified and not directly applicable in practice. Because of its simplicity, the model allows to focus on the propagation of delays through the network. For this focus and the offline case where the complete input is given in advance, we show that variations of the following parameters have a significant impact on the computational complexity of delay management: the maximum number of transfers over all passengers; the structure of the railway network; the possibility of trains to catch up on their delay; the existence of intermediate stops. The proofs of hardness are complemented with polynomial-time algorithms. We also address the online case, where the information about the delays of passengers is
منابع مشابه
Modelling and Compensation of uncertain time-delays in networked control systems with plant uncertainty using an Improved RMPC Method
Control systems with digital communication between sensors, controllers and actuators are called as Networked Control Systems (NCSs). In general, NCSs encounter with some problems such as packet dropouts and network induced delays. When plant uncertainty is added to the aforementioned problems, the design of the robust controller that is able to guarantee the stability, becomes more complex. In...
متن کاملDeveloping Robust Project Scheduling Methods for Uncertain Parameters
A common problem arising in project management is the fact that the baseline schedule is often disrupted during the project execution because of uncertain parameters. As a result, project managers are often unable to meet the deadline time of the milestones. Robust project scheduling is an effective approach in case of uncertainty. Upon adopting this approach, schedules are protected against po...
متن کاملMulti-objective scheduling and assembly line balancing with resource constraint and cost uncertainty: A “box” set robust optimization
Assembly lines are flow-oriented production systems that are of great importance in the industrial production of standard, high-volume products and even more recently, they have become commonplace in producing low-volume custom products. The main goal of designers of these lines is to increase the efficiency of the system and therefore, the assembly line balancing to achieve an optimal system i...
متن کاملRobust production scheduling in open-pit mining under uncertainty: a box counterpart approach
Open-Pit Production Scheduling (OPPS) problem focuses on determining a block sequencing and scheduling to maximize Net Present Value (NPV) of the venture under constraints. The scheduling model is critically sensitive to the economic value volatility of block, block weight, and operational capacity. In order to deal with the OPPS uncertainties, various approaches can be recommended. Robust opti...
متن کاملScheduling Post-Distribution Cross-Dock under Demand Uncertainty
The system of distribution of goods and services, along with other economic developments around the world, is rapidly evolving. In the world of distribution of goods, the main focus is on making distribution operations more effective. Due to the fact that the cross-dock has the advantage of removing intermediaries and reducing the space required for the warehouse, it is worth considering. Among...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
عنوان ژورنال:
دوره شماره
صفحات -
تاریخ انتشار 2008