Test Generation for Duration Systems

نویسندگان

  • Saddek Bensalem
  • Lotfi Majdoub
  • Stavros Tripakis
  • Moez Krichen
  • Riadh Robbana
چکیده

We are interested in generating tests for duration systems modeling real-time systems. The specification of a duration system is given as a duration graph. Duration graphs are an extension of timed graphs and are suitable for modeling the accumulated times spent by computations within the considered duration system. In this paper, we present a method for generating tests for duration systems based on the so-called approximation method. First, we use the approximation method to extend the specification model into an approximate model. The latter contains the digitization computations of the initial model. Test trees are then extracted from the approximate model. We explain how the obtained digital-test trees can be executed in an analog-fashion.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Loss of Load Expectation Assessment in Deregulated Power Systems Using Monte Carlo Simulation and Intelligent Systems

Deregulation policy has caused some changes in the concepts of power systems reliability assessment and enhancement. In this paper, generation reliability is considered, and a method for its assessment using intelligent systems is proposed. Also, because of power market and generators’ forced outages stochastic behavior, Monte Carlo Simulation is used for reliability evaluation. Generation r...

متن کامل

A Heuristic Approach to Distributed Generation Source Allocation for Electrical Power Distribution Systems

The recent trends in electrical power distribution system operation and management are aimed at improving system conditions in order to render good service to the customer. The reforms in distribution sector have given major scope for employment of distributed generation (DG) resources which will boost the system performance. This paper proposes a heuristic technique for allocation of distribut...

متن کامل

Symbolic Test Case Generation for Time-Discrete Hybrid Systems

In this article we present a model-based test case specification and associated test data generation methods for embedded systems processing Boolean, integral and real-valued variables. Testing experts are relieved from the task of constructing input data to the system under test in an explicit way and manually calculating the expected reactions. Instead, test cases are specified by means of te...

متن کامل

A Stochastic Operational Planning Model for Smart Power Systems

Smart Grids are result of utilizing novel technologies such as distributed energy resources, and communication technologies in power system to compensate some of its defects. Various power resources provide some benefits for operation domain however, power system operator should use a powerful methodology to manage them. Renewable resources and load add uncertainty to the problem. So, independe...

متن کامل

An adaptive modified firefly algorithm to unit commitment problem for large-scale power systems

Unit commitment (UC) problem tries to schedule output power of generation units to meet the system demand for the next several hours at minimum cost. UC adds a time dimension to the economic dispatch problem with the additional choice of turning generators to be on or off.  In this paper, in order to improve both the exploitation and exploration abilities of the firefly algorithm (FA), a new mo...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2007