An integrated, quantitative approach to assessing fault-seal risk

نویسنده

  • Richard M. Jones
چکیده

Fault sealing is one of the key factors controlling hydrocarbon accumulations and trap volumetrics and can be a significant influence on reservoir performance during production. Fault seal is, therefore, a major exploration and production uncertainty. We introduce a systematic framework in which the geologic risk of faults trapping hydrocarbons may be assessed. A fault may seal if deformation processes have created a membrane seal, or if it juxtaposes sealing rocks against reservoir rocks, and the fault has not been reactivated subsequent to hydrocarbons charging the trap. It follows from this statement that the integrated probability of fault seal can be expressed as {1 [(1 a)(1 b)]} (1 c), where a, b, and c are the probabilities of deformation process sealing, juxtaposition sealing, and of the fault being reactivated subsequent to charge, respectively. This relationship provides an assessment of fault-seal risk that integrates results from the critical parameters of fault-seal analysis that can be incorporated into standard exploration procedures for estimating the probability for geologic success. The integrated probability of fault seal for each prospect can be visualized using the fault-seal risk web, which allows rapid comparison of success and failure cases through construction of prospect risk web profiles. The impact of uncertainty (U ) and the value of information (VOI) for each aspect of fault sealing on the overall fault-seal risk may be determined via the construction of data webs and the relation U = [1 {(nw) / n}] 100, where nw is the value given to each data web parameter and n is the number of data web components. For example, the data web components required to assess fault reactivation risk are the orientation andmagnitude of the in-situ principal stresses, pore pressure, fault architecture, and the geomechanical properties of the fault. Risking of the Apollo prospect, Dampier subbasin, NorthWest shelf, Australia is presented as a worked example. Fault-seal risking for the Apollo prospect has been conducted on 10and 100-ft oil Copyright #2003. The American Association of Petroleum Geologists. All rights reserved. Manuscript received July 31, 2002; provisional acceptance August 27, 2002; revised manuscript received October 8, 2002; final acceptance October 10, 2002. AAPG Bulletin, v. 87, no. 3 (March 2003), pp. 507–524 507 508 An Integrated, Quantitative Approach to Assessing Fault-Seal Risk columns to allow integration with volumetric probabilistic statements. The critical parameter for fault-seal risking at the Apollo prospect is the ability of disaggregation zone faults (low shale gouge ratio fault gouge) to support increasingly large hydrocarbon columns. Evaluation of the individual components for Apollo fault sealing indicates a = 0.3 (10-ft column) and a = 0.1 (100-ft column), b = 0.2, and c = 0.1. The overall probability of the Apollo trapbounding fault sealing a 10-ft oil column is 0.4 or 40% (seal condition moderately unlikely). The likelihood that the fault seals oil columns greater than 100 ft is 0.3 (seal condition unlikely). Data web error margins for the Apollo prospect are 20% (juxtaposition uncertainty), 26% (fault-rock process uncertainty), and 27% (fault reactivation uncertainty). Recalculating each parameter by its uncertainty, for a 10-ft oil column, the upper value of integrated faultseal risk is 0.5 (seal condition intermediate), and the lower value is 0.3 (seal condition unlikely). The upper value of integrated faultseal risk for a 100-ft oil column is 0.3 (seal condition unlikely), and the lower value is 0.2 (seal condition very unlikely). The variation in the Apollo final risk calculation reflects the lack of prospect-specific data. The greatest VOI benefit for Apollo fault-seal prospectivity is sedimentary architecture data.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Monitoring tectonic activity in tunnel walls with radar interferometry: a case study of tunnels of Hormozgan Province, Iran

Communication and transportation networks are among the most important infrastructures critically involved in the development of different countries. The structural and tectonic position of Iran causes significant damage to its communication networks every year. Therefore, it is essential to adopt an integrated and flexible approach for assessing seismic risk in terms of available indicators. T...

متن کامل

Application of Fuzzy Fault Tree Analysis on Oil and Gas Offshore Pipelines

Fault Tree Analysis (FTA) as a Probabilistic Risk Assessment (PRA) method is used to identify basic causes leading to an undesired event, to represent logical relation of these basic causes in leading to the event, and finally to calculate the probability of occurrence of this event. To conduct a quantitative FTA, one needs a fault tree along with failure data of the Basic Events (BEs). Someti...

متن کامل

Applicable risk assessment methods in occupational and environmental exposure to nanoparticles - a narrative review

Nanoparticles (NPs) are a heterogeneous group of materials that have various applications, and their risk assessment is an essential condition. This study aimed to review the applicable risk assessment methods in occupational and environmental exposures to NPs. A literature search for articles published since 2005 in Web of Knowledge, Scopus, PubMed, Science Direct, and Google Scholar, using ap...

متن کامل

Risk Analysis of Operating Room Using the Fuzzy Bayesian Network Model

To enhance Patient’s safety, we need effective methods for risk management. This work aims to propose an integrated approach to risk management for a hospital system. To improve patient’s safety, we should develop flexible methods where different aspects of risk and type of information are taken into consideration. This paper proposes a fuzzy Bayesian network to model and analyze risk in the op...

متن کامل

Concurrent Optimization of Patients’ Trust and Integrated Resilience Engineering: A Z-Number Data Envelopment Analysis Approach

Background and Objectives: Emergency departments often encounter several risk and health issues which significantly impact on overall healthcare performance. Resilience engineering (RE) enables emergency departments to confront sudden changes and handling health risk issues. Patient trust (PT) is also one of the most effective factors which improve quality of care along with pa...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2003