Genetic Algorithm Approach for Solving the Machine-Job Assignment with Controllable Processing Times
نویسنده
چکیده
This paper considers a genetic algorithm (GA) for a machine-job assignment with controllable processing times (MJACPT). Integer representation with standard genetic operators is used. In an objective function, a job assignment is obtained from genetic code and for this, fixed assignment processing times are calculated by solving a constrained nonlinear convex optimization problem. Additionally, the job assignment of each individual is improved by local search. Computational results are presented for the instances from literature and modified large-scale instances for the generalized assignment problem (GAP). It can be seen that the proposed GA approach reaches almost all optimal solutions, which are known in advance, except in one case. For large-scale instances, GA obtained reasonably good solutions in relatively short computational time.
منابع مشابه
SINGLE MACHINE DUE DATE ASSIGNMENT SCHEDULING PROBLEM WITH PRECEDENCE CONSTRAINTS AND CONTROLLABLE PROCESSING TIMES IN FUZZY ENVIRONMENT
In this paper, a due date assignment scheduling problem with precedence constraints and controllable processing times in uncertain environment is investigated, in which the basic processing time of each job is assumed to be the symmetric trapezoidal fuzzy number, and the linear resource consumption function is used.The objective is to minimize the crisp possibilistic mean (or expected) value of...
متن کاملA Flexible Job Shop Scheduling Problem with Controllable Processing Times to Optimize Total Cost of Delay and Processing
In this paper, the flexible job shop scheduling problem with machine flexibility and controllable process times is studied. The main idea is that the processing times of operations may be controlled by consumptions of additional resources. The purpose of this paper to find the best trade-off between processing cost and delay cost in order to minimize the total costs. The proposed model, flexibl...
متن کاملA faster algorithm for a due date assignment problem with tardy jobs
Keywords: Single-machine sequencing Weighted number of tardy jobs Due date assignment a b s t r a c t The single-machine due date assignment problem with the weighted number of tardy jobs objective, (the TWNTD problem), and its generalization with resource allocation decisions and controllable job processing times have been solved in O(n 4) time by formulating and solving a series of assignment...
متن کاملA bi-objective identical parallel machine scheduling problem with controllable processing times: a just-in-time approach
In this research, a bi-objective scheduling problem with controllable processing times on identical parallel machines is investigated. The direction of this paper is mainly motivated by the adoption of the just-in-time (JIT) philosophy on identical parallel machines in terms of bi-objective approach, where the job processing times are controllable. The aim of this study is to simultaneously min...
متن کاملA Bi-Objective Airport Gate Scheduling with Controllable Processing Times Using Harmony Search and NSGA-II Algorithms
Optimizing gate scheduling at airports is an old, but also a broad problem. The main purpose of this problem is to find an assignment for the flights arriving at and departing from an airport, while satisfying a set of constraints.A closer look at the literature in this research line shows thatin almost all studies airport gate processing time has been considered as a fix parameter. In this res...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید
ثبت ناماگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید
ورودعنوان ژورنال:
- Computing and Informatics
دوره 31 شماره
صفحات -
تاریخ انتشار 2012