The Challenges and Obstacles of Post-Disaster Road Infrastructure Reconstruction in the Pre-Construction Phase

ثبت نشده
چکیده

The University Repository is a digital collection of the research output of the University, available on Open Access. Copyright and Moral Rights for the items on this site are retained by the individual author and/or other copyright owners. Users may access full items free of charge; copies of full text items generally can be reproduced, displayed or performed and given to third parties in any format or medium for personal research or study, educational or not-for-profit purposes without prior permission or charge, provided:

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

The Challenges and Obstacles of Post-Disaster Road Infrastructure Reconstruction in the Pre-Construction Phase

s: Purpose-The reconstruction of road infrastructure in the post-disaster context require different approach when compared with road projects in the normal development context. Disaster recovery projects are seen as having their own unique identity, particularly due to stakeholder issues, resource challenges, capability issues, and even long-term reliability concerns. This paper invites a discu...

متن کامل

The Challenges and Obstacles of Post-Disaster Road Infrastructure Reconstruction in the Pre-Construction Phase

The University Repository is a digital collection of the research output of the University, available on Open Access. Copyright and Moral Rights for the items on this site are retained by the individual author and/or other copyright owners. Users may access full items free of charge; copies of full text items generally can be reproduced, displayed or performed and given to third parties in any ...

متن کامل

O2: Post-Crash and Trauma Care for Children

Road traffic injuries as a man-made calamity impose great burden on poor people and needs to be addressed through social justice and end of poverty. Pointing out that around 186,300 children under the age of 18 are killed every year, and much more are injured, urgent need to work on road safety measures will be revealed. Although preventing road traffic crashes from occurring should be the main...

متن کامل

The role of trees as a natural index in post-disaster reconstruction (Case Study: Palm groves of Bam, Following the 2003 Bam earthquake)

Background & objective: Trees, as an influential element, have an important role in post disaster reconstruction in four aspects; they can be used as "temporary settlement materials", "reviving collective memories", "creating calm” and “motivation for reconstruction". In addition, as "living memorials”, they remind the disaster and indicate the necessity of preparedness and resilience of societ...

متن کامل

Rebirth of a city lessons learned from post disaster reconstruction the case study: Rofayye\'

After disasters, one of the main challenges confronting authorities is site selection for reconstructing damaged structures. Experiences indicate that appropriate policies in site-selection could greatly influence on reconstruction success and residents' satisfaction. Meanwhile, in literature related to post disaster reconstruction, avoiding from relocating settlements is generally emphasize...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2016